{"id":127551,"date":"2015-08-19T21:53:49","date_gmt":"2015-08-20T03:53:49","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/08\/19\/kitchen-project-day-287-migratory-cabinetry.html"},"modified":"2015-08-21T15:20:13","modified_gmt":"2015-08-21T21:20:13","slug":"kitchen-project-day-287-migratory-cabinetry","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/08\/19\/kitchen-project-day-287-migratory-cabinetry.html","title":{"rendered":"Kitchen Project  &#8211; Day 287: Migratory Cabinetry"},"content":{"rendered":"<p>Last weekend Jim and I got (mostly) installed the salvaged cabinetry from the Before kitchen into the basement. We still need to do some electrical work (moving a plug), and some countertop purchases, but by and large it&#39;s looking pretty good, and will add some new storage flexibility into the basement area.<\/p>\n<p>We&#39;re probably getting close to the end of the Kitchen Project saga. There are a few small interior things to deal with (contractor-wise, at least), and a lot of the outside remaining stuff (contractor-wise) looks to be complete this week. That will just leave us with the (literal) heavy lifting of landscaping and reorganization and getting stuff put away &#8230; but that&#39;s probably not fair to keep track of as a day count.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6184844083999758641\/6184844082757781826?authkey=CLnO753LzLW-IQ'><img src='https:\/\/lh3.googleusercontent.com\/-3x5gPShfWmc\/VdT67K_0SUI\/AAAAAAADXOc\/nVH9H9jbD4k\/IMG_20150816_173908828.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url();'><\/a>\u00a0\n<\/div>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/MgMwjbADjEs'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last weekend Jim and I got (mostly) installed the salvaged cabinetry from the Before kitchen into the basement. We still need to do some electrical work (moving a plug), and some countertop purchases, but by and large it&#39;s looking pretty good, and will add some new storage flexibility into the basement area. We&#39;re probably getting &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/08\/19\/kitchen-project-day-287-migratory-cabinetry.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project  &#8211; Day 287: Migratory Cabinetry&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":127552,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-127551","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/08\/IMG_20150816_173908828.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49819,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/12\/kitchen-project-day-127-drywall.html","url_meta":{"origin":127551,"position":0},"title":"Kitchen Project &#8211; Day 127: Drywall!","author":"***Dave","date":"Thu 12-Mar-15 5:33pm","format":false,"excerpt":"So yesterday they started installing the drywall \/ sheetrock \/ gypsum board, and just a day's worth of work has made a tremendous difference ...... in the amount of mess one can track around the house after checking out what was done.But it is finally beginning to form \"real\" walls,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150311_145540170_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150311_145540170_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150311_145540170_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49970,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/31\/kitchen-project-day-146-and-now-a-moment-of-silence.html","url_meta":{"origin":127551,"position":1},"title":"Kitchen Project &#8211; Day 146: And Now, a Moment of Silence","author":"***Dave","date":"Tue 31-Mar-15 10:29pm","format":false,"excerpt":"So ... Jim the Father-in-Law has flown off, having contributed an inestimable amount toward getting the cabinetry in shape (with much assist from his lovely assistance, Ginger, the Mother-in-Law, and far too little assist from Me, the Guy Whose Big Project Has Had Two Go-Lives In As Many Weeks). The\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150331_174812645_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49236,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/11\/kitchen-project-day-67-prepping-the-garage-kitchen.html","url_meta":{"origin":127551,"position":2},"title":"Kitchen Project &#8211; Day 67: Prepping the Garage Kitchen","author":"***Dave","date":"Sun 11-Jan-15 1:27pm","format":false,"excerpt":"Not a lot of outside progress to show, as the contractor has been having problems with crews on another job and is trying to get that situation in hand before getting the framing started on our end. In the interim, since in theory the kitchen goes \"down\" in 2-3 weeks,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150111_123707720_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":41558,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/03\/29\/kitchen-update-cabinetry.html","url_meta":{"origin":127551,"position":3},"title":"Kitchen Update: Cabinetry","author":"***Dave","date":"Sat 29-Mar-14 9:43am","format":false,"excerpt":"Went through the floor plan yesterday deciding on cabinetry. That sounds like a no-brainer, but is cause for some serious thought. \u00a0That section\u00a0there -- do you want a 6\" drawer with a cabinet beneath? \u00a0Should the cabinet have a couple of shelves -- pull-out or fixed? \u00a0Or maybe two 6\"\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/03\/another-country-kitchen%5B1%5D.jpg.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49547,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/11\/the-noises-coming-from-my-kitchen-as-they-tear-the-cabinetry-apart-are-truly-terrifying.html","url_meta":{"origin":127551,"position":4},"title":"The noises coming from my kitchen as they tear the cabinetry apart are truly terrifying.","author":"***Dave","date":"Wed 11-Feb-15 9:57am","format":false,"excerpt":"The noises coming from my kitchen as they tear the cabinetry apart are truly terrifying. View on Twitter","rel":"","context":"In &quot;~Tweets&quot;","block_context":{"text":"~Tweets","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/tweets"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":49526,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/09\/kitchen-project-day-96-whats-missing-from-this-picture.html","url_meta":{"origin":127551,"position":5},"title":"Kitchen Project &#8211; Day 96: What&#039;s Missing from This Picture?","author":"***Dave","date":"Mon 9-Feb-15 7:39pm","format":false,"excerpt":"And now things get (real) again. Yes, we started interior demolition! Woot! And we have a door. Way. Doorway. And less cabinetry than than we did yesterday! (Stored in the garage, mostly).Also, a Dumpster. Or \"Skip.\" Upon the \"Sward.\"While cabinetry is being hauled out the front, the plastic sheeting dust\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150209_162143629_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150209_162143629_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150209_162143629_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/127551","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=127551"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/127551\/revisions"}],"predecessor-version":[{"id":127587,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/127551\/revisions\/127587"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/127552"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=127551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=127551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=127551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}