{"id":39870,"date":"2013-12-02T22:39:02","date_gmt":"2013-12-03T05:39:02","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2013\/12\/02\/kitchen-in-the-garage.html"},"modified":"2014-11-05T10:17:18","modified_gmt":"2014-11-05T17:17:18","slug":"kitchen-in-the-garage","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2013\/12\/02\/kitchen-in-the-garage.html","title":{"rendered":"Kitchen in the Garage"},"content":{"rendered":"<div class=\"gpb-content\">Margie and Jim mapped out how the kitchen expansion will look by drawing on the floor of the garage in chalk (with an actual folding table for the island in the middle). \u00a0(The stove is at the center of the far end, by the garage door.)<\/p>\n<p>It was actually pretty cool, and has me <i>really<\/i> looking forward to the project.\ufeff<\/div>\n<p class='gpb-album-title' style='clear:both;'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/5953035203804556705'>In album Kitchen<\/a><\/p>\n<div class='gpb-photo-primary'><img src='https:\/\/lh6.googleusercontent.com\/-bJ1igCzhS1w\/Up1t-pme7zI\/AAAAAAAAhj0\/vYgVriq7jP0\/IMG_20131202_191238.jpg?imgmax=1600' border='0' style='max-width:100%;' \/><\/div>\n<p><\/p>\n<div class='gpb-photo-thumbnail'>\n<div style='height:60px;width:60px;overflow:hidden;margin:5px 5px 0px 0px;display:inline-block;'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/5953035203804556705\/5953035205771773234'><img style='max-width:none;' src='https:\/\/lh3.googleusercontent.com\/-gEjPNsFQn2c\/Up1t-qdrxTI\/AAAAAAAAhj0\/nqsMH5U5ZJw\/IMG_20131202_191253.jpg' border='0' \/><\/a><\/div>\n<div style='height:60px;width:60px;overflow:hidden;margin:5px 5px 0px 0px;display:inline-block;'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/5953035203804556705\/5953035206962788290'><img style='max-width:none;' src='https:\/\/lh5.googleusercontent.com\/-yyBSfFNxO4E\/Up1t-u5pN8I\/AAAAAAAAhj0\/q3lur9jZKxo\/IMG_20131202_191350.jpg' border='0' \/><\/a><\/div>\n<\/div>\n<p><\/p>\n<p class='gpb-links' style='clear:both;'> <a class='gpb-linkback' href='https:\/\/plus.google.com\/101083456815352083930\/posts\/6ZDVgXhxX9v' target='_new'>View this post on Google+<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Margie and Jim mapped out how the kitchen expansion will look by drawing on the floor of the garage in chalk (with an actual folding table for the island in the middle). \u00a0(The stove is at the center of the far end, by the garage door.) It was actually pretty cool, and has me really &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2013\/12\/02\/kitchen-in-the-garage.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen in the Garage&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-39870","post","type-post","status-publish","format-standard","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49236,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/11\/kitchen-project-day-67-prepping-the-garage-kitchen.html","url_meta":{"origin":39870,"position":0},"title":"Kitchen Project &#8211; Day 67: Prepping the Garage Kitchen","author":"***Dave","date":"Sun 11-Jan-15 1:27pm","format":false,"excerpt":"Not a lot of outside progress to show, as the contractor has been having problems with crews on another job and is trying to get that situation in hand before getting the framing started on our end. In the interim, since in theory the kitchen goes \"down\" in 2-3 weeks,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150111_123707720_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49520,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/08\/kitchen-project-day-95-a-tale-of-two-kitchens.html","url_meta":{"origin":39870,"position":1},"title":"Kitchen Project &#8211; Day 95: A Tale of Two Kitchens","author":"***Dave","date":"Sun 8-Feb-15 10:48pm","format":false,"excerpt":"So this weekend was a milestone, as we moved out of the old kitchen and into a temporary setup in the garage. We did some packing up and sorting last weekend and during the week, but this weekend was the big final push, as they will start demo on Monday\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150208_160048018_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150208_160048018_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150208_160048018_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51973,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/07\/28\/kitchen-project-day-265-exterior-touch-up.html","url_meta":{"origin":39870,"position":2},"title":"Kitchen Project &#8211; Day 265: Exterior Touch-Up","author":"***Dave","date":"Tue 28-Jul-15 7:58pm","format":false,"excerpt":"Things are going a bit slowly at the moment, though there has been progress made. The fence and gates are back up, and most (but not all) of the side yard grading and walls are complete. We're waiting on some inspection on the large retaining wall before we can polish\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49885,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/20\/kitchen-project-day-134-from-empty-to-full.html","url_meta":{"origin":39870,"position":3},"title":"Kitchen Project &#8211; Day 134: From Empty to Full","author":"***Dave","date":"Fri 20-Mar-15 4:04am","format":false,"excerpt":"Yesterday, I had a cavernous new, empty kitchen.Today, I have a kitchen (and dining room) full of boxes.Said boxes are our cabinets, which have been down in a warehouse in Colorado Springs for some months. They were delivered today, and Jim (the father-in-law) not only crossed off each one as\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150319_120500059_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150319_120500059_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150319_120500059_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49651,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/23\/kitchen-project-day-110-the-final-footprint-plus-sink.html","url_meta":{"origin":39870,"position":4},"title":"Kitchen Project &#8211; Day 110: The Final Footprint, plus Sink!","author":"***Dave","date":"Mon 23-Feb-15 8:41pm","format":false,"excerpt":"(Sorry for the dearth of other blogging. I'm sick. But house projects march on.)They knocked out the final bits of former wall that are going away, and now the full floor space of the New Kitchen stands revealed. Huzzah!Also, our garage sink is installed and working. Huzzah!(Okay, need to go\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150223_163800625_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150223_163800625_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150223_163800625_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49596,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/16\/i-dont-think-i-have-ever-stepped-into-such-a-pleasantly-aromatic-garage.html","url_meta":{"origin":39870,"position":5},"title":"I don&#8217;t think I have ever stepped into such a pleasantly aromatic garage","author":"***Dave","date":"Mon 16-Feb-15 5:44pm","format":false,"excerpt":"I don't think I have ever stepped into such a pleasantly aromatic garage #temporarykitchen #crockpot View on Twitter","rel":"","context":"In &quot;~Tweets&quot;","block_context":{"text":"~Tweets","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/tweets"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/39870","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=39870"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/39870\/revisions"}],"predecessor-version":[{"id":46351,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/39870\/revisions\/46351"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=39870"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=39870"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=39870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}