{"id":41540,"date":"2014-03-26T17:15:36","date_gmt":"2014-03-26T23:15:36","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2014\/03\/26\/kitchen-update-architect.html"},"modified":"2014-11-05T10:13:05","modified_gmt":"2014-11-05T17:13:05","slug":"kitchen-update-architect","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2014\/03\/26\/kitchen-update-architect.html","title":{"rendered":"Kitchen Update: Architect!"},"content":{"rendered":"<div class=\"gpb-content\">So I haven&#39;t talked much about our kitchen project recently because &#8230; well &#8230; (Mutters under breath, shakes head, takes a drink.)<\/p>\n<p>But, today, progress! \u00a0Our architect came over and did\u00a0detailed measurements of the existing so that he can start doing as-builts and, from those, the actual design plans.<\/p>\n<p>Jim, my father-in-law &#8212; who did detailed sketches and design work for what we have to date &#8212; is in town this week, which was fortuitous timing.<\/p>\n<p>To date, we do have the initial structural drawings from the professional engineer. We&#39;ve also determined that we don&#39;t need to get any HOA approval because &#8230;<\/p>\n<p>&#8230; well, our local HOA has decided it&#39;s not really an HOA and has no enforcement authority over the CC&amp;Rs, but is only an voluntary advisory board. Which &#8230; I hope means our neighbors don&#39;t paint their house Broncos colors next door, but anyway &#8230;<\/p>\n<p>So there we are. The next step, once we have the drawings, is to get estimates. We have a contractor we&#39;ve done work with &#8212; we&#39;ll see what they come up with for an actual estimate, as well as their time availability. We also have another contractor lead so we can have some options.<\/p>\n<p>In some parallel and possibly more ideal world than this, we would have been actually under construction at the moment. \u00a0That&#39;s disappointing &#8230; but today, at least, we made progress. (Smiles, nods head, makes everyone a drink.)\ufeff<\/p><\/div>\n<div class='gpb-photo-primary'><img src='https:\/\/lh4.googleusercontent.com\/-cmq08QFaigs\/UzNbrWyHlkI\/AAAAAAACrDg\/Pq-eWjK5Wfo\/84229bd_20%255B1%255D.jpeg?imgmax=1024' border='0' style='max-width:100%;' \/><\/div>\n<p><\/p>\n<p class='gpb-links' style='clear:both;'> <a class='gpb-linkback' href='https:\/\/plus.google.com\/101083456815352083930\/posts\/FAN2d91QyCz' target='_new'>View this post on Google+<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>So I haven&#39;t talked much about our kitchen project recently because &#8230; well &#8230; (Mutters under breath, shakes head, takes a drink.) But, today, progress! \u00a0Our architect came over and did\u00a0detailed measurements of the existing so that he can start doing as-builts and, from those, the actual design plans. Jim, my father-in-law &#8212; who did &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2014\/03\/26\/kitchen-update-architect.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Update: Architect!&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":41541,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-41540","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/03\/84229bd_205B15D.jpeg.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":41777,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/04\/21\/kitchen-project-update.html","url_meta":{"origin":41540,"position":0},"title":"Kitchen Project Update!","author":"***Dave","date":"Mon 21-Apr-14 11:39pm","format":false,"excerpt":"We've interviewed the General Contractors we're looking to use. The Architect came over today with preliminary construction drawings and some questions (\"Do you really want a two-foot-wide choke-point there?\")Next up: some answers to the architect, finalized construction drawings to forward to the GCs for bid, deciding on a GC, getting\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/04\/05-kitchen-remodel-jpg_0018295B15D.jpg.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":40879,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/01\/25\/remodeling-kitchen-please-send-money.html","url_meta":{"origin":41540,"position":1},"title":"Remodeling kitchen. Please send money","author":"***Dave","date":"Sat 25-Jan-14 6:14pm","format":false,"excerpt":"So this is our big Spring project, a kitchen remodel. Went by an appliance place we hadn't gone to before in the area, and I guess it was a successful visit because it changed our minds (maybe) on everything we thought we had settled.\u00a0To a degree we're suffering from option\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":43481,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/07\/11\/kitchen-project-achievement-unlocked-building-permit-application.html","url_meta":{"origin":41540,"position":2},"title":"Kitchen Project: Achievement Unlocked! Building Permit Application!","author":"***Dave","date":"Fri 11-Jul-14 5:01pm","format":false,"excerpt":"Went down to city hall this afternoon and applied for our building permit for the kitchen project. Since it involves adding onto the house, it has to go through zoning approval, so feedback should be received in 5-10 business days.The process was relatively smooth and quick, though some of my\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/07\/2012-01-24-isp5B15D.jpg.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49839,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/16\/kitchen-project-day-130-feeling-fretful.html","url_meta":{"origin":41540,"position":3},"title":"Kitchen Project &#8211; Day 130: Feeling Fretful","author":"***Dave","date":"Mon 16-Mar-15 4:29am","format":false,"excerpt":"Not much new to report in terms of actual progress on the Great Kitchen Expansion and Remodel. More drywall work, mostly mudding this and that.No, this weekend was spent doing ... stuff. And not quite doing ... stuff. And worrying about ... stuff.So we figured out our replacement normal backsplash\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/dont%2Blike%2Bthis%2Badventure.gifimgmax%3D660.gif?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":2486,"url":"https:\/\/hill-kleerup.org\/blog\/2002\/06\/14\/thank_god_its_f.html","url_meta":{"origin":41540,"position":4},"title":"Thank God It&#8217;s Friday Five!","author":"***Dave","date":"Fri 14-Jun-02 11:38am","format":false,"excerpt":"Time, once again (at last) for The Friday Five 1. How often do you do laundry? Interval between laundery is the shortest of (a) Katherine to run out of clean...","rel":"","context":"In &quot;Personal Q&amp;A&quot;","block_context":{"text":"Personal Q&amp;A","link":"https:\/\/hill-kleerup.org\/blog\/category\/personal\/personal-qa"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":43668,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/07\/18\/kitchen-project-achievement-unlocked-building-permit.html","url_meta":{"origin":41540,"position":5},"title":"Kitchen Project: Achievement Unlocked! Building Permit!","author":"***Dave","date":"Fri 18-Jul-14 1:18pm","format":false,"excerpt":"Got word that the city, in record time, approved our kitchen remodel \/ expansion, and without any changes to the drawings submitted. \u00a0Wahoo!We sent out bid packages to four General Contractors on Wednesday, asking for responses (cost, schedule, available start date) by the end of the month. \u00a0This is getting\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/07\/moving-addamsfamily-dancing.gif.gif?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/41540","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=41540"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/41540\/revisions"}],"predecessor-version":[{"id":46341,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/41540\/revisions\/46341"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/41541"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=41540"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=41540"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=41540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}