{"id":43481,"date":"2014-07-11T17:01:45","date_gmt":"2014-07-11T23:01:45","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2014\/07\/11\/kitchen-project-achievement-unlocked-building-permit-application.html"},"modified":"2014-07-13T10:44:01","modified_gmt":"2014-07-13T16:44:01","slug":"kitchen-project-achievement-unlocked-building-permit-application","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2014\/07\/11\/kitchen-project-achievement-unlocked-building-permit-application.html","title":{"rendered":"Kitchen Project: Achievement Unlocked! Building Permit Application!"},"content":{"rendered":"<div class=\"gpb-content\">Went down to city hall this afternoon and applied for our building permit for the kitchen project. Since it involves adding onto the house, it has to go through zoning approval, so feedback should be received in 5-10 business days.<\/p>\n<p>The process was relatively smooth and quick, though some of my prep was overdone. The city supposedly has \u00a0&quot;paperless&quot; process &#8212; just hand them a CD with all the files and then files can be updated through DropBox &#8212; but the person at the building office said that the head building inspector prefers to have paper plans, and would need them anyway for the field inspection. \u00a0Sooooo &#8230; I did give them a copy of the CD, but also my wet-stamped copies of the architect and structural engineer drawings that I had brought along.<\/p>\n<p>And, a substantial chunk of change later, those wheels are now turning. Huzzah!\ufeff<\/p><\/div>\n<div class='gpb-photo-primary'><img src='https:\/\/lh3.googleusercontent.com\/-bO01kbnY54Q\/U8BspmOoxhI\/AAAAAAACxOI\/ffAXqr4fBQA\/2012-01-24-isp%255B1%255D.jpg?imgmax=1024' border='0' style='max-width:100%;' \/><\/div>\n<p><\/p>\n<p class='gpb-links' style='clear:both;'> <a class='gpb-linkback' href='https:\/\/plus.google.com\/101083456815352083930\/posts\/8bA8EorB5Kb' target='_new'>View this post on Google+<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Went down to city hall this afternoon and applied for our building permit for the kitchen project. Since it involves adding onto the house, it has to go through zoning approval, so feedback should be received in 5-10 business days. The process was relatively smooth and quick, though some of my prep was overdone. The &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2014\/07\/11\/kitchen-project-achievement-unlocked-building-permit-application.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project: Achievement Unlocked! Building Permit Application!&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":43482,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-43481","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/07\/2012-01-24-isp5B15D.jpg.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":43668,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/07\/18\/kitchen-project-achievement-unlocked-building-permit.html","url_meta":{"origin":43481,"position":0},"title":"Kitchen Project: Achievement Unlocked! Building Permit!","author":"***Dave","date":"Fri 18-Jul-14 1:18pm","format":false,"excerpt":"Got word that the city, in record time, approved our kitchen remodel \/ expansion, and without any changes to the drawings submitted. \u00a0Wahoo!We sent out bid packages to four General Contractors on Wednesday, asking for responses (cost, schedule, available start date) by the end of the month. \u00a0This is getting\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/07\/moving-addamsfamily-dancing.gif.gif?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":48416,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/18\/kitchen-project-day-12-piering-ahead.html","url_meta":{"origin":43481,"position":1},"title":"Kitchen Project &#8211; Day 12: Piering Ahead","author":"***Dave","date":"Tue 18-Nov-14 11:39pm","format":false,"excerpt":"The weather cleared and armed enough to get the helical piers started for the additional spaces. These are steel rods, square (1.5\" to the side), which are bored into the ground down to the bedrock, a helical disk on the very end. When the torque of drilling down with them\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141118_140907313.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49957,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-144-islands-and-peninsula.html","url_meta":{"origin":43481,"position":2},"title":"Kitchen Project &#8211; Day 144: Islands and Peninsula","author":"***Dave","date":"Sun 29-Mar-15 8:26pm","format":false,"excerpt":"Next up: an Isthmus!We completed the island (save some decorative panels), and put up the rest of the wall cabinets where the peninsula will be. Also we laid down the foundation for the peninsula. Woot!Also, crown molding. Lots of crown molding. Tomorrow -- building the peninsula, adding some paneling, putting\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150329_180519398_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150329_180519398_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150329_180519398_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49697,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/26\/kitchen-project-day-112-lights-water-action.html","url_meta":{"origin":43481,"position":3},"title":"Kitchen Project &#8211; Day 112: LIghts! Water! Action!","author":"***Dave","date":"Thu 26-Feb-15 1:15am","format":false,"excerpt":"Plumbing finished up Monday, running the drains and supply for the island, as well as the feed over to the refrigerator for the ice maker.Today was electrical contractors, focusing initially on getting lighting fixtures up in the kitchen, but also beginning work around the sub-panel that will have to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150224_100248911_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49545,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/11\/kitchen-project-day-98-gutted.html","url_meta":{"origin":43481,"position":4},"title":"Kitchen Project &#8211; Day 98: Gutted","author":"***Dave","date":"Wed 11-Feb-15 10:43pm","format":false,"excerpt":"Today saw all the cabinets removed, as well as the pantry and the soffits. The kitchen was of an era where there was a soffit all around the perimeter, to allow a big wood framed bank of fluorescent lights in the center.Some months after we moved in -- 19 years\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150211_153754720.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150211_153754720.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150211_153754720.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":43386,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/07\/07\/kitchen-project-achievement-unlocked.html","url_meta":{"origin":43481,"position":5},"title":"Kitchen Project: Achievement Unlocked!","author":"***Dave","date":"Mon 7-Jul-14 6:44pm","format":false,"excerpt":"We now have full-sized plans (two sets) to give to the city for the permitting process! Alas, just hardcopy; electronic copy to follow tomorrow or Wednesday.\ufeff View this post on Google+","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/07\/IMG_20140707_163740172.jpg.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/43481","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=43481"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/43481\/revisions"}],"predecessor-version":[{"id":43515,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/43481\/revisions\/43515"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/43482"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=43481"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=43481"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=43481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}