{"id":47454,"date":"2014-11-10T06:34:41","date_gmt":"2014-11-10T13:34:41","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2014\/11\/10\/kitchen-project-day-4.html"},"modified":"2014-11-12T10:21:07","modified_gmt":"2014-11-12T17:21:07","slug":"kitchen-project-day-4","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/10\/kitchen-project-day-4.html","title":{"rendered":"Kitchen Project &#8211; Day 4"},"content":{"rendered":"<p>Needs more backhoe!<\/p>\n<p>More progress in getting more dirt dug up. By the end of the day, the area for the extension of the new foundation was pretty well cleared out. Next up, as I understand it, will be getting the guys out to put in the helical piers that will keep the whole thing in place.<\/p>\n<p>This week will be challenging for the project, as tomorrow we get some snow and rain in the afternoon, and temps dropping below freezing with sundown. and stays below freezing until, oh, Friday or so (with some more snow in the meantime). That won&#39;t necessarily prevent the piers being put in, or the forms being put together for the extended foundation, etc., but it will keep them from doing any concrete pouring until temps climb back up a bit &#8212; and temps don&#39;t look to be going up above 40 as far as the ten-day forecast can be counted on.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6079958406569798657\/6079958407937549410'><img src='https:\/\/lh6.googleusercontent.com\/--8adzSRGmco\/VGBZ9YJEZGI\/AAAAAAAC49w\/MVF20vp3yrs\/IMG_20141109_123015084_HDR.jpg?imgmax=660' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6079958406569798657\/6079958409395678738' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-Sft42v9UJ1k\/VGBZ9dktrhI\/AAAAAAAC49w\/BXugk23ulEs\/IMG_20141109_122400336.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6079958406569798657\/6079958405940957490' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh4.googleusercontent.com\/-fc04cSEBLgQ\/VGBZ9QtC0TI\/AAAAAAAC49w\/ij24O5vc_Lo\/IMG_20141109_122737154.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6079958406569798657\/6079958408295817362' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-S3XPQjwUJxk\/VGBZ9ZefIJI\/AAAAAAAC49s\/CgSLGg20IHI\/IMG_20141109_144601368.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6079958406569798657\/6079958409193532482' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-W0HgI2Bf00w\/VGBZ9c0hLEI\/AAAAAAAC49w\/iKcRVEWlPjA\/IMG_20141109_144949466.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6079958406569798657'>In Album Hill-Kleerup Kitchen &#8211; 2014-11-09<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/101083456815352083930\/posts\/L52UwxdYT9N'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Needs more backhoe! More progress in getting more dirt dug up. By the end of the day, the area for the extension of the new foundation was pretty well cleared out. Next up, as I understand it, will be getting the guys out to put in the helical piers that will keep the whole thing &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2014\/11\/10\/kitchen-project-day-4.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 4&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":47455,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-47454","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141109_123015084_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":48628,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/12\/03\/kitchen-project-day-28-total-rebar.html","url_meta":{"origin":47454,"position":0},"title":"Kitchen Project &#8211; Day 28: Total Rebar","author":"***Dave","date":"Wed 3-Dec-14 10:44pm","format":false,"excerpt":"A lot of these pictures are looking similar because progress has been incremental this week. Rebar put in, rebar taken out and put in again, rebar welded. So ... here's the world of rebar.The structural engineer was supposed to come by today and give his blessing on the piers and\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/12\/IMG_20141202_131251503_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":48416,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/18\/kitchen-project-day-12-piering-ahead.html","url_meta":{"origin":47454,"position":1},"title":"Kitchen Project &#8211; Day 12: Piering Ahead","author":"***Dave","date":"Tue 18-Nov-14 11:39pm","format":false,"excerpt":"The weather cleared and armed enough to get the helical piers started for the additional spaces. These are steel rods, square (1.5\" to the side), which are bored into the ground down to the bedrock, a helical disk on the very end. When the torque of drilling down with them\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141118_140907313.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":47923,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/11\/kitchen-project-day-5.html","url_meta":{"origin":47454,"position":2},"title":"Kitchen Project &#8211; Day 5","author":"***Dave","date":"Tue 11-Nov-14 1:08pm","format":false,"excerpt":"\"There's a hole in the yard like a great brown pit ...\"So here we are, with the primary excavation finished. Not much progress Monday, as digging up finished on Sunday, and now we're waiting on the guys to install the helical piers which will hold up the new piece of\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141110_125811097.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":48131,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/14\/kitchen-project-day-8.html","url_meta":{"origin":47454,"position":3},"title":"Kitchen Project &#8211; Day 8","author":"***Dave","date":"Fri 14-Nov-14 7:53pm","format":false,"excerpt":"Not much activity this week, since it's been so bitterly cold. Today the GC and Assistant came out to prep the excavation for helical piers to be sunk on Monday. These piers, down to the bedrock, will anchor the house addition and keep it from crashing down into the neighbor's\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141114_153218981.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141114_153218981.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141114_153218981.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":48433,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/21\/kitchen-project-day-14.html","url_meta":{"origin":47454,"position":4},"title":"Kitchen Project &#8211; Day 14","author":"***Dave","date":"Fri 21-Nov-14 7:12am","format":false,"excerpt":"Things have been quiet a couple of days. Four of the five piers are in, but the fifth (against the house, where they are cutting the existing foundation for the door) will have to wait for the framing and backfill of the foundation to provide space for the Bobcat to\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141118_210221786.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":16959,"url":"https:\/\/hill-kleerup.org\/blog\/2010\/03\/24\/the-snow-out-back.html","url_meta":{"origin":47454,"position":5},"title":"The snow out back","author":"***Dave","date":"Wed 24-Mar-10 6:27am","format":false,"excerpt":"Everything's nicely coated. Temps are right around freezing. Good day for hot coffee.","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/47454","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=47454"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/47454\/revisions"}],"predecessor-version":[{"id":47992,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/47454\/revisions\/47992"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/47455"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=47454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=47454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=47454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}