{"id":49236,"date":"2015-01-11T13:27:15","date_gmt":"2015-01-11T20:27:15","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/01\/11\/kitchen-project-day-67-prepping-the-garage-kitchen.html"},"modified":"2015-08-21T15:27:31","modified_gmt":"2015-08-21T21:27:31","slug":"kitchen-project-day-67-prepping-the-garage-kitchen","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/11\/kitchen-project-day-67-prepping-the-garage-kitchen.html","title":{"rendered":"Kitchen Project &#8211; Day 67: Prepping the Garage Kitchen"},"content":{"rendered":"<p>Not a lot of outside progress to show, as the contractor has been having problems with crews on another job and is trying to get that situation in hand before getting the framing started on our end.  <\/p>\n<p>In the interim, since in theory the kitchen goes &quot;down&quot; in 2-3 weeks, we&#39;re prepping the garage for the eventual use of it as a temp kitchen.  The picture on the left is some old cabinetry we&#39;d installed when we moved in. Like a dolt I didn&#39;t take a &quot;Before,&quot; but imagine the countertop covered with junk, an extra shelf also covered in junk, and the shelf with some small boxes for organizing in them also covered in junk. Huzzah.<\/p>\n<p>Found some amazing things on that counter, including at least one box of stuff that had been cleared out of the back of one of our cars about 13 years go (it included a small diaper kit, and some incredibly small socks). So this is all turning into a good opportunity to clean things up and throw things out.<\/p>\n<p>Which leads to the second picture, showing a garbage can of garbage and two cans of recycle, resulting from the effort. (There are also five smallish boxes of Stuff that are now packaged up for later storage.)<\/p>\n<p>Current plan is to put a sink in that countertop, so that we&#39;ve got a place for doing some washing up, and end up with a garage sink when done for cleaning up paint brushes and after yard work, etc.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6103180629991562209\/6103180631017850786'><img src='https:\/\/lh6.googleusercontent.com\/-FtSeZhVqkDo\/VLLacqfdB6I\/AAAAAAAC9UM\/8rUuq4raNkU\/IMG_20150111_123707720_HDR.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6103180629991562209\/6103180628398407890' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh4.googleusercontent.com\/-UsuyYJOHTxY\/VLLacgu7gNI\/AAAAAAAC9UM\/AbhGTbfuDmk\/IMG_20150111_123719352.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6103180629991562209'>In Album Hill-Kleerup Kitchen &#8211; 2014-01-11<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/101083456815352083930\/posts\/8ds4qUp4rQH'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Not a lot of outside progress to show, as the contractor has been having problems with crews on another job and is trying to get that situation in hand before getting the framing started on our end. In the interim, since in theory the kitchen goes &quot;down&quot; in 2-3 weeks, we&#39;re prepping the garage for &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/01\/11\/kitchen-project-day-67-prepping-the-garage-kitchen.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 67: Prepping the Garage Kitchen&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49237,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150111_123707720_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":46207,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/03\/kitchen-project-prepping-the-groundwork.html","url_meta":{"origin":49236,"position":0},"title":"Kitchen Project: Prepping the groundwork","author":"***Dave","date":"Mon 3-Nov-14 6:13am","format":false,"excerpt":"The first part of the project -- through the end of the year -- is external. In extending out the basement, we also want to make it a walk-out, for convenience and for house value. The basement is currently about 3 feet below grade, and even though the property slopes\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/Excavation%5B1%5D.jpegimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/Excavation%5B1%5D.jpegimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/Excavation%5B1%5D.jpegimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":16521,"url":"https:\/\/hill-kleerup.org\/blog\/2010\/01\/11\/tweets-from-2010-01-11.html","url_meta":{"origin":49236,"position":1},"title":"Tweets from 2010-01-11","author":"***Dave","date":"Mon 11-Jan-10 11:30pm","format":false,"excerpt":"Mwah-ha-ha. Scheduled party during K's Girl Scout cookie sale. Party-goers won't know what hit them. # Margie is getting around with weight on her right foot with remarkable ability. Yay! Go, Margie! # I keep thinking of New Critical Things That Must Be Done far faster than I can even\u2026","rel":"","context":"In &quot;~Tweets&quot;","block_context":{"text":"~Tweets","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/tweets"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":39870,"url":"https:\/\/hill-kleerup.org\/blog\/2013\/12\/02\/kitchen-in-the-garage.html","url_meta":{"origin":49236,"position":2},"title":"Kitchen in the Garage","author":"***Dave","date":"Mon 2-Dec-13 10:39pm","format":false,"excerpt":"Margie and Jim mapped out how the kitchen expansion will look by drawing on the floor of the garage in chalk (with an actual folding table for the island in the middle). \u00a0(The stove is at the center of the far end, by the garage door.)It was actually pretty cool,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":49520,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/08\/kitchen-project-day-95-a-tale-of-two-kitchens.html","url_meta":{"origin":49236,"position":3},"title":"Kitchen Project &#8211; Day 95: A Tale of Two Kitchens","author":"***Dave","date":"Sun 8-Feb-15 10:48pm","format":false,"excerpt":"So this weekend was a milestone, as we moved out of the old kitchen and into a temporary setup in the garage. We did some packing up and sorting last weekend and during the week, but this weekend was the big final push, as they will start demo on Monday\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150208_160048018_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150208_160048018_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150208_160048018_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":48860,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/12\/10\/family-words.html","url_meta":{"origin":49236,"position":4},"title":"Family words","author":"***Dave","date":"Wed 10-Dec-14 5:38pm","format":false,"excerpt":"Every family has, I think, catch phrases and made-up words (often from childrearing deays) that mean things only to them.We've got a couple in our household, acronyms in fact. And both are getting a workout during the construction project.KIAMO (kee-YAHM-oh): An old D&D group term for \"Kill It And Move\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/12\/dictionary%5B1%5D.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/12\/dictionary%5B1%5D.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/12\/dictionary%5B1%5D.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51973,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/07\/28\/kitchen-project-day-265-exterior-touch-up.html","url_meta":{"origin":49236,"position":5},"title":"Kitchen Project &#8211; Day 265: Exterior Touch-Up","author":"***Dave","date":"Tue 28-Jul-15 7:58pm","format":false,"excerpt":"Things are going a bit slowly at the moment, though there has been progress made. The fence and gates are back up, and most (but not all) of the side yard grading and walls are complete. We're waiting on some inspection on the large retaining wall before we can polish\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49236"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49236\/revisions"}],"predecessor-version":[{"id":127616,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49236\/revisions\/127616"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49237"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}