{"id":49346,"date":"2015-01-23T18:26:54","date_gmt":"2015-01-24T01:26:54","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/01\/23\/kitchen-project-day-79-progress.html"},"modified":"2015-08-21T15:24:56","modified_gmt":"2015-08-21T21:24:56","slug":"kitchen-project-day-79-progress","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/23\/kitchen-project-day-79-progress.html","title":{"rendered":"Kitchen Project &#8211; Day 79: Progress!"},"content":{"rendered":"<p>Significant progress, as the framing on the basement level is completed, joists run, floor of the kitchen level put in place, and one wall erected. It&#39;s reached a level where it&#39;s visible from the surrounding streets, and it&#39;s almost possible to start visualizing how it will look (once you add on a sloping roofline parallel to the existing one).<\/p>\n<p>As a side note, having folks hammering stuff into your wall gets mightly loud inside. The cats aren&#39;t wowed about it, either.<\/p>\n<p>Walls should get broken through in a couple of weeks. Then stuff gets <i>real.<\/i><\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711005023994850'><img src='https:\/\/lh6.googleusercontent.com\/-zp96Ka7orxY\/VMLyzI0zA-I\/AAAAAAADCWo\/y7yfGk3fRO8\/IMG_20150123_162604598_HDR.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711004406945314' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-U_KrYiug8QE\/VMLyzGhrliI\/AAAAAAADCfg\/nRYDIxiVmDs\/IMG_20150123_152605045.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711003762561906' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-MeLUiZ3pFFw\/VMLyzEIDE3I\/AAAAAAADCWo\/HVu-njjxuU4\/IMG_20150123_162749386_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711003164047122' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-QjjBInHl0_I\/VMLyzB5WdxI\/AAAAAAADCWo\/o5afuVXzW6E\/IMG_20150123_162825175_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711005795150386' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh4.googleusercontent.com\/-bJG1A7VQtZk\/VMLyzLsp6jI\/AAAAAAADCWo\/9aIFYG4mQBI\/IMG_20150123_162902312.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711003490403922' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-wTa4FsUFEkU\/VMLyzDHKRlI\/AAAAAAADCWo\/9WHZu00R-88\/IMG_20150123_162936439_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711003049522098' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-8ST7o_eSDzQ\/VMLyzBeC87I\/AAAAAAADCWo\/y3rcCXkqzXU\/IMG_20150123_163021661.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711005051049586' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-yTvfZUma-1E\/VMLyzI7P1nI\/AAAAAAADCWo\/Te2pC-hNiAI\/IMG_20150123_163045504_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711005469396162' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-vYkLsDOOWZk\/VMLyzKe_TMI\/AAAAAAADCWo\/qE6syUj4n9U\/IMG_20150123_163102657_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711006684935586' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-FiqbViWYdmo\/VMLyzPAy9aI\/AAAAAAADCWo\/e-_91IG97xA\/IMG_20150123_163139322.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711003357600130' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-MwvPxxvGgx8\/VMLyzCnf2YI\/AAAAAAADCWo\/kA5xUUQeSl0\/IMG_20150123_163320808.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361\/6107711004422492722' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-vahcW3_xvVg\/VMLyzGlY0jI\/AAAAAAADCWo\/yaIEv_nXea8\/IMG_20150123_163437908.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6107711004441627361'>In Album Hill-Kleerup Kitchen &#8211; 2015-01-23<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/101083456815352083930\/posts\/i7fA3ZcKJuY'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Significant progress, as the framing on the basement level is completed, joists run, floor of the kitchen level put in place, and one wall erected. It&#39;s reached a level where it&#39;s visible from the surrounding streets, and it&#39;s almost possible to start visualizing how it will look (once you add on a sloping roofline parallel &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/01\/23\/kitchen-project-day-79-progress.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 79: Progress!&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49346","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150123_162604598_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":51973,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/07\/28\/kitchen-project-day-265-exterior-touch-up.html","url_meta":{"origin":49346,"position":0},"title":"Kitchen Project &#8211; Day 265: Exterior Touch-Up","author":"***Dave","date":"Tue 28-Jul-15 7:58pm","format":false,"excerpt":"Things are going a bit slowly at the moment, though there has been progress made. The fence and gates are back up, and most (but not all) of the side yard grading and walls are complete. We're waiting on some inspection on the large retaining wall before we can polish\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":48912,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/12\/14\/kitchen-project-day-36-basement-cleaning-extreme.html","url_meta":{"origin":49346,"position":1},"title":"Kitchen Project &#8211; Day 36: Basement Cleaning EXTREME!","author":"***Dave","date":"Sun 14-Dec-14 7:25pm","format":false,"excerpt":"So the existing basement gets impacted by the project with a door being punched through the existing foundation (behind the wainscoting) into the new basement room, as well as ceiling activity related to plumbing and HVAC for the kitchen above.Since there will be a bit of initial demo in during\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/12\/IMG_20141214_165140005.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/12\/IMG_20141214_165140005.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/12\/IMG_20141214_165140005.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":138087,"url":"https:\/\/hill-kleerup.org\/blog\/2019\/03\/06\/kitchen-mis-design.html","url_meta":{"origin":49346,"position":2},"title":"Kitchen Mis-Design","author":"***Dave","date":"Wed 6-Mar-19 11:08pm","format":false,"excerpt":"The New Employer moved into this building last summer, everything all new-designed and spiffy and fresh. The kitchens are a disaster. They're huge, certainly -- forty feet long, a dozen feet wide. You could hold a small party in here. Entrances on either end, so traffic flow of that sort\u2026","rel":"","context":"In &quot;Architecture&quot;","block_context":{"text":"Architecture","link":"https:\/\/hill-kleerup.org\/blog\/category\/media\/architecture"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":49895,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/20\/kitchen-project-day-135-cabinetapalooza-day-1.html","url_meta":{"origin":49346,"position":3},"title":"Kitchen Project &#8211; Day 135: Cabinetapalooza Day 1","author":"***Dave","date":"Fri 20-Mar-15 11:53pm","format":false,"excerpt":"Got a number of cabinets mounted on the east wall today. Ran into a few difficulties, but by and large it went very well. Started working on a corner cabinet (which was constructed very ... oddly), but didn't get that done.Good first-day progress. If we keep this up, we should\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150320_111602200.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49472,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/02\/kitchen-project-day-88-is-moving-usually-this-hard.html","url_meta":{"origin":49346,"position":4},"title":"Kitchen Project &#8211; Day 88: Is Moving Usually This Hard?","author":"***Dave","date":"Mon 2-Feb-15 6:55am","format":false,"excerpt":"I've moved lots of times in my life -- but, come to think of it, it's rarely been on this kind of household level.When I was a kid we moved a few times -- from NoCal to SoCal, from SoCal to Colorado, from Colorado back to SoCal. I honestly don't\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150201_180635453.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150201_180635453.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150201_180635453.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":50509,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/07\/kitchen-project-day-182.html","url_meta":{"origin":49346,"position":5},"title":"Kitchen Project: Day 182","author":"***Dave","date":"Thu 7-May-15 4:47am","format":false,"excerpt":"So not a huge amount of progress lately, but we got the pendants hung over the island, and the tile extension to the new boundary of the kitchen put in, and a stray panel of wood to cover a cabinet side placed.Tomorrow is a big day: the backsplash gets installed.\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150505_141432306.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150505_141432306.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150505_141432306.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49346","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49346"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49346\/revisions"}],"predecessor-version":[{"id":127611,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49346\/revisions\/127611"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49347"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}