{"id":49560,"date":"2015-02-13T06:56:20","date_gmt":"2015-02-13T06:56:20","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/02\/13\/kitchen-project-day-99-gutted-even-more.html"},"modified":"2015-08-21T15:24:16","modified_gmt":"2015-08-21T21:24:16","slug":"kitchen-project-day-99-gutted-even-more","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/13\/kitchen-project-day-99-gutted-even-more.html","title":{"rendered":"Kitchen Project &#8211; Day 99: Gutted (even more)"},"content":{"rendered":"<p>The drywall is off. The wood flooring is pulled. Re-framing has commenced.  Not sure when the wall, wall, wall comes down, down, down, but &#8230; soon, I suspect.<\/p>\n<p>Subs are going to start coming in tomorrow and next week for the HVAC, electrical, and plumbing work to get more immediately scoped.<\/p>\n<p>Also going on (though a bit less interesting at the moment) is interior framing in the basement extension, to deal with foundation ledges, crazy pier clamps, and the need for insulation.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6115216559733591105\/6115216560265246738'><img src='https:\/\/lh3.googleusercontent.com\/-qX3TLISYG4Y\/VN2dD88yOBI\/AAAAAAADJSI\/VmvKgmsQSk0\/IMG_20150212_172732331.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6115216559733591105\/6115216558310424562' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-IxIX9BK6e0g\/VN2dD1qt__I\/AAAAAAADJSQ\/cqvt_nlKjqg\/IMG_20150212_172611755.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6115216559733591105\/6115216558228021506' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-AK54UyX6OuE\/VN2dD1XEoQI\/AAAAAAADJSQ\/zyTlbb5TunU\/IMG_20150212_172559373.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6115216559733591105\/6115216560592625906' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-xb_bjGDFuzE\/VN2dD-K1oPI\/AAAAAAADJSQ\/wJVbEPRWLTc\/IMG_20150212_172625940.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6115216559733591105\/6115216558984434738' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-3N90fg1MMrc\/VN2dD4LalDI\/AAAAAAADJSQ\/Hek_svMbx1g\/IMG_20150212_172639561.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6115216559733591105\/6115216557273226402' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh4.googleusercontent.com\/-DKl2JP6p8rw\/VN2dDxzbnKI\/AAAAAAADJSQ\/Su95zZo94l0\/IMG_20150212_172811693.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6115216559733591105\/6115216560987777842' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh4.googleusercontent.com\/-6NyItU5YFQQ\/VN2dD_pDKzI\/AAAAAAADJSQ\/kT1Kevqs398\/IMG_20150212_172724513.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6115216559733591105'>In Album Hill-Kleerup Kitchen &#8211; 2015-02-12<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/101083456815352083930\/posts\/369kMSZyNND'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The drywall is off. The wood flooring is pulled. Re-framing has commenced. Not sure when the wall, wall, wall comes down, down, down, but &#8230; soon, I suspect. Subs are going to start coming in tomorrow and next week for the HVAC, electrical, and plumbing work to get more immediately scoped. Also going on (though &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/02\/13\/kitchen-project-day-99-gutted-even-more.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 99: Gutted (even more)&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49561,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49560","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150212_172732331.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49346,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/23\/kitchen-project-day-79-progress.html","url_meta":{"origin":49560,"position":0},"title":"Kitchen Project &#8211; Day 79: Progress!","author":"***Dave","date":"Fri 23-Jan-15 6:26pm","format":false,"excerpt":"Significant progress, as the framing on the basement level is completed, joists run, floor of the kitchen level put in place, and one wall erected. It's reached a level where it's visible from the surrounding streets, and it's almost possible to start visualizing how it will look (once you add\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150123_162604598_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49292,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/20\/kitchen-project-day-75-some-assembly-required.html","url_meta":{"origin":49560,"position":1},"title":"Kitchen Project &#8211; Day 75: Some Assembly Required","author":"***Dave","date":"Tue 20-Jan-15 5:09pm","format":false,"excerpt":"Lumber was dropped off yesterday for the kitchen\/basement extension framing. I arrived home early from the office (for some late-evening phone calls), and found the delivery truck in front of the house, leaving off at least some percentage of the lumber going into the effort.Framing is supposed to start today.\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150119_151719828.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49135,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/04\/kitchen-project-day-60-not-a-creature-was-stirring.html","url_meta":{"origin":49560,"position":2},"title":"Kitchen Project &#8211; Day 60: Not a Creature Was Stirring","author":"***Dave","date":"Sun 4-Jan-15 8:37am","format":false,"excerpt":"Not much done on the kitchen while we were away. The slab has been poured (it's visible around the edges -- though as of this morning it's covered again). We're assured the framing will start this week ... sometime ... \u00a0 View on Google+","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150103_120147402.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":48433,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/21\/kitchen-project-day-14.html","url_meta":{"origin":49560,"position":3},"title":"Kitchen Project &#8211; Day 14","author":"***Dave","date":"Fri 21-Nov-14 7:12am","format":false,"excerpt":"Things have been quiet a couple of days. Four of the five piers are in, but the fifth (against the house, where they are cutting the existing foundation for the door) will have to wait for the framing and backfill of the foundation to provide space for the Bobcat to\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/IMG_20141118_210221786.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":48604,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/30\/kitchen-project-day-24.html","url_meta":{"origin":49560,"position":4},"title":"Kitchen Project: Day 24","author":"***Dave","date":"Sun 30-Nov-14 11:25pm","format":false,"excerpt":"Not a lot of visible progress outside, as, around the Thanksgiving holiday, the crew has been working on putting in rebar around the forms in the excavation for the foundation of the extension.Meanwhile, Margie sealed a deal for the fridge we had planned on buying (a floor model with a\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/New%2BGE%2BFridge%2B2014.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/New%2BGE%2BFridge%2B2014.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/New%2BGE%2BFridge%2B2014.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49516,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/07\/kitchen-project-yay-for-no-asbestos-in-the-existing-inside-ceiling-and-wall-materials-kitchenproject.html","url_meta":{"origin":49560,"position":5},"title":"Kitchen Project: Yay for No Asbestos in the Existing Inside Ceiling and Wall Materials! #kitchenproject","author":"***Dave","date":"Sat 7-Feb-15 11:09am","format":false,"excerpt":"Kitchen Project: Yay for No Asbestos in the Existing Inside Ceiling and Wall Materials! #kitchenproject View on Twitter","rel":"","context":"In &quot;~Tweets&quot;","block_context":{"text":"~Tweets","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/tweets"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49560","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49560"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49560\/revisions"}],"predecessor-version":[{"id":127601,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49560\/revisions\/127601"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49561"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}