{"id":49614,"date":"2015-02-18T12:53:18","date_gmt":"2015-02-18T12:53:18","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/02\/18\/kitchen-project-day-105-duct-duct-goose.html"},"modified":"2015-05-13T12:18:05","modified_gmt":"2015-05-13T18:18:05","slug":"kitchen-project-day-105-duct-duct-goose","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/18\/kitchen-project-day-105-duct-duct-goose.html","title":{"rendered":"KItchen Project &#8211; Day 105: Duct, Duct, Goose"},"content":{"rendered":"<p>Two changes yesterday. First, the roofers came by (with their own skip, of course) and prepped the roof for replacing the shingles. These were the 30-year Hail-Resistant shingles that we put in two years ago, but which couldn&#39;t stand up to the hail storm we had at the end of September. That was true for a lot of folk in the neighborhood.<\/p>\n<p>Anyway, we&#39;re using the same roofer as is doing the roofing on the kitchen extension, which will be saving us some money, and why it&#39;s getting mentioned in one of these posts.<\/p>\n<p>Second going-on was the HVAC guy coming in to start putting in new ductwork for the kitchen and the basement extension.<\/p>\n<p>Plans for the rest of this week is wrapping that up, plus the plumber beginning work (starting, I hope, with the garage sink) and getting the new extension wrapped and siding started. Once that happens, the wall to the kitchen can come <i>down.<\/i><\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161\/6117165033212003922'><img src='https:\/\/lh3.googleusercontent.com\/-cpK17xaWoBQ\/VOSJMAUKxlI\/AAAAAAADJjY\/PDUAjNUyHjQ\/IMG_20150217_163954419_HDR.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161\/6117165036141890322' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-Zu-Ke98uve4\/VOSJMLOtSxI\/AAAAAAADJjY\/qS7BZmqghcM\/IMG_20150217_144258478.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161\/6117165035504302738' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-NMmWVZSsdBE\/VOSJMI2sepI\/AAAAAAADJjY\/_Tp0mDbXen4\/IMG_20150217_144959875.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161\/6117165036471416482' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-lYckzbRMrF8\/VOSJMMdRdqI\/AAAAAAADJjY\/ZproJ_9lDDE\/IMG_20150217_164428549.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161\/6117165034798497874' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-4fpWKnzxSbA\/VOSJMGOawFI\/AAAAAAADJjY\/daaqjT0ZsMI\/IMG_20150217_164454403.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161\/6117165035277907986' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-ivQzkjOdZuY\/VOSJMIAt-BI\/AAAAAAADJjY\/nGL-aTNLvpk\/IMG_20150217_164446559.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161\/6117165034916054226' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-Ss_yV8GVxB0\/VOSJMGqchNI\/AAAAAAADJjY\/vG3ABtT-Gvc\/IMG_20150217_164521997.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161\/6117165035831824114' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-jYW28mu0qO0\/VOSJMKEyDvI\/AAAAAAADJjY\/xo7zZCVGimQ\/IMG_20150215_162550099.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6117165035558824161'>In Album Hill-Kleerup Kitchen &#8211; 2015-02-17<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/101083456815352083930\/posts\/edANkT11haY'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two changes yesterday. First, the roofers came by (with their own skip, of course) and prepped the roof for replacing the shingles. These were the 30-year Hail-Resistant shingles that we put in two years ago, but which couldn&#39;t stand up to the hail storm we had at the end of September. That was true for &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/02\/18\/kitchen-project-day-105-duct-duct-goose.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;KItchen Project &#8211; Day 105: Duct, Duct, Goose&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49615,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49614","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150217_163954419_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49617,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/18\/kitchen-project-day-105-part-2.html","url_meta":{"origin":49614,"position":0},"title":"Kitchen Project &#8211; Day 105 (Part 2)","author":"***Dave","date":"Wed 18-Feb-15 9:44pm","format":false,"excerpt":"So the previous post should have been Day 104, since it was for what happened yesterday. Ah, well.Today the roofers came and started working on tearing off the old shingles and replacing them, as well as papering the roof of the new kitchen extension.Further ductwork was ducted, and most of\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150218_151357889.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150218_151357889.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150218_151357889.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51102,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/13\/kitchen-project-day-189-manic-and-depressive.html","url_meta":{"origin":49614,"position":1},"title":"Kitchen Project: Day 189 &#8211; Manic and Depressive","author":"***Dave","date":"Wed 13-May-15 11:10pm","format":false,"excerpt":"Really, if you want to feel what it's like to suffer from manic-depressive disorder, do a major home remodeling project, preferably a kitchen. I find my mood swings wildly depending on what went well or what didn't on any given day.What went well today - I finished up two pieces\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150513_112001377_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49630,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/19\/kitchen-project-day-106-crunch-on-the-outside.html","url_meta":{"origin":49614,"position":2},"title":"Kitchen Project &#8211; Day 106: Crunch on the Outside","author":"***Dave","date":"Thu 19-Feb-15 9:57pm","format":false,"excerpt":"Roofing on the roof! Siding on the side! It's all about PROGRESS!So as I'm working at home, and needing to get on a phone call this afternoon, I suddenly discover LOUD HAMMERING on the extension that is right there, where I am on the ground floor.So I go up stairs,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150219_163233851.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49292,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/20\/kitchen-project-day-75-some-assembly-required.html","url_meta":{"origin":49614,"position":3},"title":"Kitchen Project &#8211; Day 75: Some Assembly Required","author":"***Dave","date":"Tue 20-Jan-15 5:09pm","format":false,"excerpt":"Lumber was dropped off yesterday for the kitchen\/basement extension framing. I arrived home early from the office (for some late-evening phone calls), and found the delivery truck in front of the house, leaving off at least some percentage of the lumber going into the effort.Framing is supposed to start today.\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150119_151719828.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":32747,"url":"https:\/\/hill-kleerup.org\/blog\/2013\/03\/18\/up-on-the-roof-day-1.html","url_meta":{"origin":49614,"position":4},"title":"Up on the Roof, Day 1","author":"***Dave","date":"Mon 18-Mar-13 6:40pm","format":false,"excerpt":"Our reroofing project begins, as they deliver the shingles. \u00a0The coolest thing was the big extensible conveyor belt to actually move the shingles up to the to the rooftop.In addition to replacing our old, fragmenting shake shingles with some new storm-ready asphalt laminate ones, we'll be getting some repair\/repainting work\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":49410,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/29\/kitchen-project-day-84-we-have-a-roof-line.html","url_meta":{"origin":49614,"position":5},"title":"Kitchen Project &#8211; Day 84: We have a roof line!","author":"***Dave","date":"Thu 29-Jan-15 7:02am","format":false,"excerpt":"The basic extension is now all basically framed, including the roofline. You can really see now how it lines up with and complements the existing rooflines.There's still a lot left to do to dry things in before they break through the walls, but we're going to start packing up the\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150128_165028847_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49614","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49614"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49614\/revisions"}],"predecessor-version":[{"id":51089,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49614\/revisions\/51089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49615"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}