{"id":49705,"date":"2015-02-26T19:46:59","date_gmt":"2015-02-27T02:46:59","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/02\/26\/kitchen-project-day-113-feeling-wired.html"},"modified":"2015-05-12T09:18:39","modified_gmt":"2015-05-12T15:18:39","slug":"kitchen-project-day-113-feeling-wired","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/26\/kitchen-project-day-113-feeling-wired.html","title":{"rendered":"Kitchen Project &#8211; Day 113: Feeling Wired"},"content":{"rendered":"<p>Lots of wire pulled today for the various new switches, lights, and outlets.<\/p>\n<p>Current Code calls for an outlet ever four feet along the wall (more or less) which has meant a few additional twists and turns for the various kitchen constructs.<\/p>\n<p>(One exception is the basement extension since, as we&#39;re dedicating it to storage, only requires one outlet, though we&#39;re going to do two.)<\/p>\n<p>Tomorrow: We Lose Power!  The electricians will be shutting down the electrical panel so that they can install the sub-panel we need and connect wiring to it.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6120349652101618625\/6120349649515063618'><img src='https:\/\/lh4.googleusercontent.com\/-dM8A2ROKSM0\/VO_ZlEiIKUI\/AAAAAAADKSY\/tOStNgewHQk\/IMG_20150226_152936931_HDR.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6120349652101618625\/6120349649556084546' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-M7SyTVrsnfk\/VO_ZlEr6F0I\/AAAAAAADKSY\/AkELR9bT2fY\/IMG_20150226_152946374.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6120349652101618625\/6120349652222098434' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-wVColvKzJNQ\/VO_ZlOniPAI\/AAAAAAADKSY\/3J4I00ae8mY\/IMG_20150226_153036162.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6120349652101618625\/6120349649031293698' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-gP4gXrFQf3I\/VO_ZlCuyawI\/AAAAAAADKSY\/HULTSe7XmWg\/IMG_20150226_153042982.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6120349652101618625\/6120349649294907506' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh4.googleusercontent.com\/-yBKU6BjBNF4\/VO_ZlDto2HI\/AAAAAAADKSY\/XMo-Sx7ybpk\/IMG_20150226_153228614.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6120349652101618625\/6120349650089015298' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-vuy5RcJwS6g\/VO_ZlGq9-AI\/AAAAAAADKSY\/rNH_xWHAs94\/IMG_20150226_153339030_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6120349652101618625\/6120349652092770738' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh4.googleusercontent.com\/-PYkxA2TjKJY\/VO_ZlOIs2bI\/AAAAAAADKSY\/q2rwYLcDdTk\/IMG_20150226_153359476.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6120349652101618625'>In Album Hill-Kleerup Kitchen &#8211; 2015-02-26<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/101083456815352083930\/posts\/RPUVvGFP9sY'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lots of wire pulled today for the various new switches, lights, and outlets. Current Code calls for an outlet ever four feet along the wall (more or less) which has meant a few additional twists and turns for the various kitchen constructs. (One exception is the basement extension since, as we&#39;re dedicating it to storage, &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/02\/26\/kitchen-project-day-113-feeling-wired.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 113: Feeling Wired&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49706,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49705","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150226_152936931_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":52023,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/08\/01\/kitchen-project-day-269-ranged-in.html","url_meta":{"origin":49705,"position":0},"title":"Kitchen Project &#8211; Day 269: Ranged In","author":"***Dave","date":"Sat 1-Aug-15 4:35pm","format":false,"excerpt":"The last major gap, so to speak, in the kitchen has been fixed. The range could not be pushed all the way back to the wall because of a problem with the plywood on the floor and the position of the electrical outlet. The contracting crew was out on Friday,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/08\/IMG_20150731_095850314.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51126,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/15\/kitchen-project-day-190-sink-the-sequel.html","url_meta":{"origin":49705,"position":1},"title":"Kitchen Project &#8211; Day 190: Sink! (the Sequel)","author":"***Dave","date":"Fri 15-May-15 9:34am","format":false,"excerpt":"Countertop guys returned and got the sink on the island installed. That provided an opportunity to do some cabinet work to accommodate the popup outlet that sits near it.Based on this, we can now get finish plumbing installed in the kitchen, which should happen early next week: getting faucets and\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51165,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/16\/kitchen-project-day-191-electric-touches.html","url_meta":{"origin":49705,"position":2},"title":"Kitchen Project &#8211; Day 191: Electric Touches","author":"***Dave","date":"Sat 16-May-15 2:10am","format":false,"excerpt":"The finish electrical isn't yet finished, but we made progress this afternoon. We got one of the two oven bays properly outletted (the one that's scheduled for Wednesday delivery). We got the pop-up outlet on the peninsula installed and powered up. Those were the easy parts.The range hood remains a\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150515_155318315_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51380,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/05\/kitchen-project-day-212-everything-is-handled.html","url_meta":{"origin":49705,"position":3},"title":"Kitchen Project &#8211; Day 212: Everything Is Handled","author":"***Dave","date":"Fri 5-Jun-15 8:59pm","format":false,"excerpt":"So not much new news this past week. The beveridge fridge was delivered -- and determined to be not the right beveridge fridge, per an error at the warehouse. New beveridge fridge delivery date TBD.The outlet for the range hood was properly installed. Range hood to be installed and properly\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150604_113153936_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51302,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/30\/kitchen-project-day-206-something-is-missing-here.html","url_meta":{"origin":49705,"position":4},"title":"Kitchen Project &#8211; Day 206: Something Is Missing Here","author":"***Dave","date":"Sat 30-May-15 12:42am","format":false,"excerpt":"Oh, yeah, that would be the upper oven. The highly prized (and pricey) Miele Combi-Steam\/Convection Oven, which Margie has been jonesing for a long time now.It was delivered on Thursday. Which is cool, except ...1. The outlet installed by the electricians was the wrong NEPA 6\/20. (It needed to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150529_190635807_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49697,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/26\/kitchen-project-day-112-lights-water-action.html","url_meta":{"origin":49705,"position":5},"title":"Kitchen Project &#8211; Day 112: LIghts! Water! Action!","author":"***Dave","date":"Thu 26-Feb-15 1:15am","format":false,"excerpt":"Plumbing finished up Monday, running the drains and supply for the island, as well as the feed over to the refrigerator for the ice maker.Today was electrical contractors, focusing initially on getting lighting fixtures up in the kitchen, but also beginning work around the sub-panel that will have to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150224_100248911_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49705"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49705\/revisions"}],"predecessor-version":[{"id":51023,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49705\/revisions\/51023"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49706"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}