{"id":49917,"date":"2015-03-22T21:02:36","date_gmt":"2015-03-23T03:02:36","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/03\/22\/kitchen-project-day-137-cabinetapalooza-day-3.html"},"modified":"2015-05-10T14:27:09","modified_gmt":"2015-05-10T20:27:09","slug":"kitchen-project-day-137-cabinetapalooza-day-3","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/22\/kitchen-project-day-137-cabinetapalooza-day-3.html","title":{"rendered":"Kitchen Project &#8211; Day 137: Cabinetapalooza Day 3"},"content":{"rendered":"<p>Some visible progress &#8212; some additional lower cabinets later in the day &#8212; but a lot of today was putting in crown molding in a lot of the installed uppers, and then the cabinet doors reinstalled. <\/p>\n<p>Looks great, if I do say so myself.<\/p>\n<p>Tomorrow starts the work week. I&#39;m working from home, with a goal of mostly helping Jim on the cabinet stuff, in between monitoring my email and getting on a few phone calls and <i>overseeing a frelling go-live for a major project at work.<\/i>  But I&#39;m feeling good at the pace we&#39;re attaining and with what we&#39;ve accomplished so far.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6129258681132420593\/6129258678016350610'><img src='https:\/\/lh4.googleusercontent.com\/-oW-3xfEXPzY\/VQ-ASx-lGZI\/AAAAAAADLxc\/95HzJqddhEQ\/IMG_20150322_130013329_HDR.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6129258681132420593\/6129258680453984386' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/--KmfHfAWezc\/VQ-AS7DwcII\/AAAAAAADLxQ\/dCeVBFO5Dr4\/2015-03-22.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6129258681132420593\/6129258680416421970' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-UdGJ8WkucQw\/VQ-AS66zSFI\/AAAAAAADLxc\/ZGG4_-2C5B4\/IMG_20150322_132344746.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6129258681132420593\/6129258681621699074' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-oq44DLaTnrs\/VQ-AS_aKWgI\/AAAAAAADLxc\/DGctTMg2um8\/IMG_20150322_173036499.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6129258681132420593\/6129258680756670818' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh6.googleusercontent.com\/-iXkpub9E3p4\/VQ-AS8L7EWI\/AAAAAAADLxc\/wKS90EsGZ_k\/IMG_20150322_173046805_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6129258681132420593\/6129258680593849890' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh5.googleusercontent.com\/-l7iy_-d4Isg\/VQ-AS7lGniI\/AAAAAAADLxc\/NH6w5ylquQs\/IMG_20150322_173058298_HDR.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6129258681132420593'>In Album Hill-KLeerup Kitchen &#8211; 2015-03-22<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/Qqaa3QPVpvP'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Some visible progress &#8212; some additional lower cabinets later in the day &#8212; but a lot of today was putting in crown molding in a lot of the installed uppers, and then the cabinet doors reinstalled. Looks great, if I do say so myself. Tomorrow starts the work week. I&#39;m working from home, with a &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/03\/22\/kitchen-project-day-137-cabinetapalooza-day-3.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 137: Cabinetapalooza Day 3&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49918,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49917","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150322_130013329_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49914,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/22\/kitchen-project-day-136-cabinetapalooza-day-2.html","url_meta":{"origin":49917,"position":0},"title":"Kitchen Project &#8211; Day 136: Cabinetapalooza Day 2!","author":"***Dave","date":"Sun 22-Mar-15 3:53am","format":false,"excerpt":"Home Depot Visit Tally: 2Today we finished installing one of the new corner cabinets, which have lovely lazy susans within them, but which came with the worst chintzy plastic feet for holding the cabinet up (with the graphically displayed message \"DO NOT SLIDE THIS ON FLOOR\" -- which is kind\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150321_173300191_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49930,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/24\/kitchen-project-day-139-cabinetapalooza-day-5.html","url_meta":{"origin":49917,"position":1},"title":"Kitchen Project &#8211; Day 139: Cabinetapalooza Day 5","author":"***Dave","date":"Tue 24-Mar-15 10:11pm","format":false,"excerpt":"So not a lot visible today -- in part because I was tied up with some project go-live activities at the keyboard and phone, in part because this is one of the trickier bits in the kitchen -- the framed refrigerator \"cabinet,\" with a big, deep cabinet over it. When\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150324_185157567.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49955,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-143-of-ovens-and-islands.html","url_meta":{"origin":49917,"position":2},"title":"Kitchen Project &#8211; Day 143: Of Ovens and Islands","author":"***Dave","date":"Sun 29-Mar-15 3:26am","format":false,"excerpt":"No report yesterday because there was not a lot to see, but today ...One of the more daunting elements to the kitchen cabinet install was the oven cabinet, which weighs an ungodly amount, needed to be custom-cut, and, oh yeah, weighs an ungodly amount. If there was going to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150328_170737217_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51126,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/15\/kitchen-project-day-190-sink-the-sequel.html","url_meta":{"origin":49917,"position":3},"title":"Kitchen Project &#8211; Day 190: Sink! (the Sequel)","author":"***Dave","date":"Fri 15-May-15 9:34am","format":false,"excerpt":"Countertop guys returned and got the sink on the island installed. That provided an opportunity to do some cabinet work to accommodate the popup outlet that sits near it.Based on this, we can now get finish plumbing installed in the kitchen, which should happen early next week: getting faucets and\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49895,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/20\/kitchen-project-day-135-cabinetapalooza-day-1.html","url_meta":{"origin":49917,"position":4},"title":"Kitchen Project &#8211; Day 135: Cabinetapalooza Day 1","author":"***Dave","date":"Fri 20-Mar-15 11:53pm","format":false,"excerpt":"Got a number of cabinets mounted on the east wall today. Ran into a few difficulties, but by and large it went very well. Started working on a corner cabinet (which was constructed very ... oddly), but didn't get that done.Good first-day progress. If we keep this up, we should\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150320_111602200.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51339,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/01\/kitchen-project-day-208-the-floor-drops-out.html","url_meta":{"origin":49917,"position":5},"title":"Kitchen Project &#8211; Day 208: The Floor Drops Out","author":"***Dave","date":"Mon 1-Jun-15 10:49pm","format":false,"excerpt":"On the plus side:- I have almost all of the cabinet and drawer pulls in place, and the remaining ones are bored and waiting for installation.- We've started planning the move back into the kitchen, with Many Post-It Notes to identify what should go where.On the minus side:- Dude from\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/success-really-looks-like5B15D.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/success-really-looks-like5B15D.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/success-really-looks-like5B15D.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49917","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49917"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49917\/revisions"}],"predecessor-version":[{"id":50831,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49917\/revisions\/50831"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49918"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}