{"id":49930,"date":"2015-03-24T22:11:55","date_gmt":"2015-03-25T04:11:55","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/03\/24\/kitchen-project-day-139-cabinetapalooza-day-5.html"},"modified":"2015-05-10T14:23:02","modified_gmt":"2015-05-10T20:23:02","slug":"kitchen-project-day-139-cabinetapalooza-day-5","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/24\/kitchen-project-day-139-cabinetapalooza-day-5.html","title":{"rendered":"Kitchen Project &#8211; Day 139: Cabinetapalooza Day 5"},"content":{"rendered":"<p>So not a lot visible today &#8212; in part because I was tied up with some project go-live activities at the keyboard and phone, in part because this is one of the trickier bits in the kitchen &#8212; the framed refrigerator &quot;cabinet,&quot; with a big, deep cabinet over it. <\/p>\n<p>When all was said and done, it was all pretty successful, and I expect to see a lot more visible progress tomorrow.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6130019693131930945\/6130019691948433922'><img src='https:\/\/lh5.googleusercontent.com\/-CDmnITU6ZUw\/VRI0bny8YgI\/AAAAAAADL3w\/1l8bEnFeD0o\/IMG_20150324_185157567.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url();'><\/a>\u00a0\n<\/div>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/H8PVwaGim9N'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>So not a lot visible today &#8212; in part because I was tied up with some project go-live activities at the keyboard and phone, in part because this is one of the trickier bits in the kitchen &#8212; the framed refrigerator &quot;cabinet,&quot; with a big, deep cabinet over it. When all was said and done, &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/03\/24\/kitchen-project-day-139-cabinetapalooza-day-5.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 139: Cabinetapalooza Day 5&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49931,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49930","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150324_185157567.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49917,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/22\/kitchen-project-day-137-cabinetapalooza-day-3.html","url_meta":{"origin":49930,"position":0},"title":"Kitchen Project &#8211; Day 137: Cabinetapalooza Day 3","author":"***Dave","date":"Sun 22-Mar-15 9:02pm","format":false,"excerpt":"Some visible progress -- some additional lower cabinets later in the day -- but a lot of today was putting in crown molding in a lot of the installed uppers, and then the cabinet doors reinstalled. Looks great, if I do say so myself.Tomorrow starts the work week. I'm working\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150322_130013329_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150322_130013329_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150322_130013329_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49914,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/22\/kitchen-project-day-136-cabinetapalooza-day-2.html","url_meta":{"origin":49930,"position":1},"title":"Kitchen Project &#8211; Day 136: Cabinetapalooza Day 2!","author":"***Dave","date":"Sun 22-Mar-15 3:53am","format":false,"excerpt":"Home Depot Visit Tally: 2Today we finished installing one of the new corner cabinets, which have lovely lazy susans within them, but which came with the worst chintzy plastic feet for holding the cabinet up (with the graphically displayed message \"DO NOT SLIDE THIS ON FLOOR\" -- which is kind\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150321_173300191_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49135,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/04\/kitchen-project-day-60-not-a-creature-was-stirring.html","url_meta":{"origin":49930,"position":2},"title":"Kitchen Project &#8211; Day 60: Not a Creature Was Stirring","author":"***Dave","date":"Sun 4-Jan-15 8:37am","format":false,"excerpt":"Not much done on the kitchen while we were away. The slab has been poured (it's visible around the edges -- though as of this morning it's covered again). We're assured the framing will start this week ... sometime ... \u00a0 View on Google+","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150103_120147402.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51126,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/15\/kitchen-project-day-190-sink-the-sequel.html","url_meta":{"origin":49930,"position":3},"title":"Kitchen Project &#8211; Day 190: Sink! (the Sequel)","author":"***Dave","date":"Fri 15-May-15 9:34am","format":false,"excerpt":"Countertop guys returned and got the sink on the island installed. That provided an opportunity to do some cabinet work to accommodate the popup outlet that sits near it.Based on this, we can now get finish plumbing installed in the kitchen, which should happen early next week: getting faucets and\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49955,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-143-of-ovens-and-islands.html","url_meta":{"origin":49930,"position":4},"title":"Kitchen Project &#8211; Day 143: Of Ovens and Islands","author":"***Dave","date":"Sun 29-Mar-15 3:26am","format":false,"excerpt":"No report yesterday because there was not a lot to see, but today ...One of the more daunting elements to the kitchen cabinet install was the oven cabinet, which weighs an ungodly amount, needed to be custom-cut, and, oh yeah, weighs an ungodly amount. If there was going to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150328_170737217_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":48604,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/11\/30\/kitchen-project-day-24.html","url_meta":{"origin":49930,"position":5},"title":"Kitchen Project: Day 24","author":"***Dave","date":"Sun 30-Nov-14 11:25pm","format":false,"excerpt":"Not a lot of visible progress outside, as, around the Thanksgiving holiday, the crew has been working on putting in rebar around the forms in the excavation for the foundation of the extension.Meanwhile, Margie sealed a deal for the fridge we had planned on buying (a floor model with a\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/New%2BGE%2BFridge%2B2014.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/New%2BGE%2BFridge%2B2014.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/11\/New%2BGE%2BFridge%2B2014.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49930","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49930"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49930\/revisions"}],"predecessor-version":[{"id":50820,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49930\/revisions\/50820"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49931"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49930"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49930"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}