{"id":49941,"date":"2015-03-27T06:05:13","date_gmt":"2015-03-27T12:05:13","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/03\/27\/kitchen-project-day-141-part-2.html"},"modified":"2015-05-10T13:55:17","modified_gmt":"2015-05-10T19:55:17","slug":"kitchen-project-day-141-part-2","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/27\/kitchen-project-day-141-part-2.html","title":{"rendered":"Kitchen Project &#8211; Day 141: Part 2"},"content":{"rendered":"<p>Jim and I put a lot of the doors on prior to the ladies arriving from their SoCal sojourn this past week. We also got some cabinets put up on the wall shared with the dining room &#8212; the rest of that wall, including the peninsula, will be the last ting we do.<\/p>\n<p>We got the plywood put down on the floor for the base of the island, which was a big thing. The bigger thing still lurking is the oven cabinet, a massive and heavy unit that our two ovens will go into, and that needs a base assembled for it (and to be lifted onto same). Also proper holes cut out in front for the actual ovens we&#39;re buying, holes cut in back for the power outlets, and a steam stack into the attiic space for the steam oven.<\/p>\n<p>That may be what we tackle next, before the island cuts down on our maneuvering room.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6130883735117397729\/6130883735400330306'><img src='https:\/\/lh3.googleusercontent.com\/-LzVV13YjrYg\/VRVGRkfBtEI\/AAAAAAADMBU\/yKLCvC6IByQ\/IMG_20150326_183355138.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6130883735117397729\/6130883736290698114' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-phT-fcKrs8g\/VRVGRnzTo4I\/AAAAAAADMCE\/XbHj3K5FYpY\/IMG_20150326_183325782.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6130883735117397729\/6130883737950179378' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-h_3mgMAE0PI\/VRVGRt-9UDI\/AAAAAAADMCI\/_DuH1ftrAa4\/IMG_20150326_183341555.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6130883735117397729\/6130883735436646722' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-fbWtFxceOdc\/VRVGRknr2UI\/AAAAAAADMBU\/hbs8Glzlsg8\/IMG_20150326_102008329_HDR.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6130883735117397729'>In Album Hill-Kleerup Kitchen &#8211; 2015-03-26a<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/9aCns8EJTVp'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jim and I put a lot of the doors on prior to the ladies arriving from their SoCal sojourn this past week. We also got some cabinets put up on the wall shared with the dining room &#8212; the rest of that wall, including the peninsula, will be the last ting we do. We got &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/03\/27\/kitchen-project-day-141-part-2.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 141: Part 2&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49942,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49941","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150326_183355138.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49955,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-143-of-ovens-and-islands.html","url_meta":{"origin":49941,"position":0},"title":"Kitchen Project &#8211; Day 143: Of Ovens and Islands","author":"***Dave","date":"Sun 29-Mar-15 3:26am","format":false,"excerpt":"No report yesterday because there was not a lot to see, but today ...One of the more daunting elements to the kitchen cabinet install was the oven cabinet, which weighs an ungodly amount, needed to be custom-cut, and, oh yeah, weighs an ungodly amount. If there was going to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150328_170737217_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49697,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/26\/kitchen-project-day-112-lights-water-action.html","url_meta":{"origin":49941,"position":1},"title":"Kitchen Project &#8211; Day 112: LIghts! Water! Action!","author":"***Dave","date":"Thu 26-Feb-15 1:15am","format":false,"excerpt":"Plumbing finished up Monday, running the drains and supply for the island, as well as the feed over to the refrigerator for the ice maker.Today was electrical contractors, focusing initially on getting lighting fixtures up in the kitchen, but also beginning work around the sub-panel that will have to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150224_100248911_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51126,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/15\/kitchen-project-day-190-sink-the-sequel.html","url_meta":{"origin":49941,"position":2},"title":"Kitchen Project &#8211; Day 190: Sink! (the Sequel)","author":"***Dave","date":"Fri 15-May-15 9:34am","format":false,"excerpt":"Countertop guys returned and got the sink on the island installed. That provided an opportunity to do some cabinet work to accommodate the popup outlet that sits near it.Based on this, we can now get finish plumbing installed in the kitchen, which should happen early next week: getting faucets and\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49440,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/31\/kitchen-project-day-86-there-is-something-that-loves-a-wall.html","url_meta":{"origin":49941,"position":3},"title":"Kitchen Project &#8211; Day 86: There Is Something That Loves a Wall","author":"***Dave","date":"Sat 31-Jan-15 8:27am","format":false,"excerpt":"Hey, look! Plywood walls! It's like a real structure and everything!The exterior drama is beginning to wrap up somewhat. There's still obviously more to do -- cutting out the window holes facing south toward the living room, installing said windows, siding, roofing, a door, landscape stuff -- but the basic\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150130_165047947_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150130_165047947_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150130_165047947_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49375,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/27\/kitchen-project-day-82-the-south-wall-will-rise-again.html","url_meta":{"origin":49941,"position":4},"title":"Kitchen Project &#8211; Day 82: The South Wall Will Rise (Again)","author":"***Dave","date":"Tue 27-Jan-15 5:08am","format":false,"excerpt":"The main thing today was getting the vaulted south wall up. This will have double windows matching the windows of the living room facing it. Things are beginning to fill in even more.Over the weekend, we did a bit of interior shopping, buying some very cool pendant lights for the\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150126_165941924.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51302,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/30\/kitchen-project-day-206-something-is-missing-here.html","url_meta":{"origin":49941,"position":5},"title":"Kitchen Project &#8211; Day 206: Something Is Missing Here","author":"***Dave","date":"Sat 30-May-15 12:42am","format":false,"excerpt":"Oh, yeah, that would be the upper oven. The highly prized (and pricey) Miele Combi-Steam\/Convection Oven, which Margie has been jonesing for a long time now.It was delivered on Thursday. Which is cool, except ...1. The outlet installed by the electricians was the wrong NEPA 6\/20. (It needed to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150529_190635807_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49941"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49941\/revisions"}],"predecessor-version":[{"id":50813,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49941\/revisions\/50813"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49942"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}