{"id":49957,"date":"2015-03-29T20:26:13","date_gmt":"2015-03-30T02:26:13","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-144-islands-and-peninsula.html"},"modified":"2015-08-21T15:23:02","modified_gmt":"2015-08-21T21:23:02","slug":"kitchen-project-day-144-islands-and-peninsula","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-144-islands-and-peninsula.html","title":{"rendered":"Kitchen Project &#8211; Day 144: Islands and Peninsula"},"content":{"rendered":"<p>Next up: an Isthmus!<\/p>\n<p>We completed the island (save some decorative panels), and put up the rest of the wall cabinets where the peninsula will be. Also we laid down the foundation for the peninsula. Woot!<\/p>\n<p>Also, crown molding. Lots of crown molding. <\/p>\n<p>Tomorrow &#8212; building the peninsula, adding some paneling, putting in one final cabinet by the windows after the contractors take care of some trim &#8230; and we&#39;re wrapped up (for the moment).<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6131846610534945873\/6131846613724494930'><img src='https:\/\/lh3.googleusercontent.com\/-jVx4UHHeuk8\/VRiyAdw6_FI\/AAAAAAADMMg\/vuBauw3U9jQ\/IMG_20150329_180519398_HDR.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6131846610534945873\/6131846613097810786' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-O27ksQPfVvU\/VRiyAbbgi2I\/AAAAAAADMMg\/_kt07-y230Y\/IMG_20150329_180531572_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6131846610534945873\/6131846612278747618' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-A0Q8XDOZWos\/VRiyAYYOoeI\/AAAAAAADMMg\/RWNkUH8hzO0\/IMG_20150329_180550519_HDR.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6131846610534945873'>In Album Hill-Kleerup Kitchen &#8211; 2015-03-29<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/5kEjUw76X4M'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Next up: an Isthmus! We completed the island (save some decorative panels), and put up the rest of the wall cabinets where the peninsula will be. Also we laid down the foundation for the peninsula. Woot! Also, crown molding. Lots of crown molding. Tomorrow &#8212; building the peninsula, adding some paneling, putting in one final &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-144-islands-and-peninsula.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 144: Islands and Peninsula&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49958,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49957","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150329_180519398_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49955,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-143-of-ovens-and-islands.html","url_meta":{"origin":49957,"position":0},"title":"Kitchen Project &#8211; Day 143: Of Ovens and Islands","author":"***Dave","date":"Sun 29-Mar-15 3:26am","format":false,"excerpt":"No report yesterday because there was not a lot to see, but today ...One of the more daunting elements to the kitchen cabinet install was the oven cabinet, which weighs an ungodly amount, needed to be custom-cut, and, oh yeah, weighs an ungodly amount. If there was going to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150328_170737217_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49917,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/22\/kitchen-project-day-137-cabinetapalooza-day-3.html","url_meta":{"origin":49957,"position":1},"title":"Kitchen Project &#8211; Day 137: Cabinetapalooza Day 3","author":"***Dave","date":"Sun 22-Mar-15 9:02pm","format":false,"excerpt":"Some visible progress -- some additional lower cabinets later in the day -- but a lot of today was putting in crown molding in a lot of the installed uppers, and then the cabinet doors reinstalled. Looks great, if I do say so myself.Tomorrow starts the work week. I'm working\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150322_130013329_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150322_130013329_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150322_130013329_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49982,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/04\/04\/kitchen-project-day-146-all-tidied-up.html","url_meta":{"origin":49957,"position":2},"title":"Kitchen Project &#8211; Day 146: All Tidied Up","author":"***Dave","date":"Sat 4-Apr-15 9:44am","format":false,"excerpt":"No new or exciting news the past few days, so I thought I'd run these pix from last Tuesday that show the post-cabinet-install status, after everything got cleaned up (mostly by Jim and Ginger, since I was still heads-down in office work, dagnabbit). There is still some fill-in to do\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150331_130829982.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49964,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/31\/kitchen-project-day-145-the-bones-are-in-place.html","url_meta":{"origin":49957,"position":3},"title":"Kitchen Project &#8211; Day 145: The Bones are in Place","author":"***Dave","date":"Tue 31-Mar-15 8:59am","format":false,"excerpt":"Cabinetry work is essentially complete -- there's one more back by the double-windows to put in (now that the crew has trimmed up the window), and there's some crown molding work still to do, and one panel that needs to be added, and all the cabinets and drawers need to\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150330_175854275.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150330_175854275.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150330_175854275.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49914,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/22\/kitchen-project-day-136-cabinetapalooza-day-2.html","url_meta":{"origin":49957,"position":4},"title":"Kitchen Project &#8211; Day 136: Cabinetapalooza Day 2!","author":"***Dave","date":"Sun 22-Mar-15 3:53am","format":false,"excerpt":"Home Depot Visit Tally: 2Today we finished installing one of the new corner cabinets, which have lovely lazy susans within them, but which came with the worst chintzy plastic feet for holding the cabinet up (with the graphically displayed message \"DO NOT SLIDE THIS ON FLOOR\" -- which is kind\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150321_173300191_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49941,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/27\/kitchen-project-day-141-part-2.html","url_meta":{"origin":49957,"position":5},"title":"Kitchen Project &#8211; Day 141: Part 2","author":"***Dave","date":"Fri 27-Mar-15 6:05am","format":false,"excerpt":"Jim and I put a lot of the doors on prior to the ladies arriving from their SoCal sojourn this past week. We also got some cabinets put up on the wall shared with the dining room -- the rest of that wall, including the peninsula, will be the last\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150326_183355138.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150326_183355138.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150326_183355138.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49957"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49957\/revisions"}],"predecessor-version":[{"id":50795,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49957\/revisions\/50795"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49958"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}