{"id":49964,"date":"2015-03-31T08:59:33","date_gmt":"2015-03-31T14:59:33","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/03\/31\/kitchen-project-day-145-the-bones-are-in-place.html"},"modified":"2015-05-07T16:00:08","modified_gmt":"2015-05-07T22:00:08","slug":"kitchen-project-day-145-the-bones-are-in-place","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/31\/kitchen-project-day-145-the-bones-are-in-place.html","title":{"rendered":"Kitchen Project &#8211; Day 145: The Bones are in Place"},"content":{"rendered":"<p>Cabinetry work is essentially complete &#8212; there&#39;s one more back by the double-windows to put in (now that the crew has trimmed up the window), and there&#39;s some crown molding work still to do, and one panel that needs to be added, and all the cabinets and drawers need to be vacuumed out, and the countertop people ordered to template things and &#8230;<\/p>\n<p>&#8230; but the cabinets are essentially in place, and we can see what the kitchen is going to look and feel like. And it&#39;s <i>big.<\/i><\/p>\n<p>Also, the swinging doors to\/from the dining room got installed, huzzah. They look nice (and will look nicer when painted and push plates are put on them.<\/p>\n<p>Jim heads home tonight. I couldn&#39;t have done this without him (though, given how much he accomplished while I was tied up with work stuff, he could clearly get most of it done without me).<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6132413068981494481\/6132413073222509170'><img src='https:\/\/lh3.googleusercontent.com\/-8PsEo1sNAHM\/VRq1Mv1jonI\/AAAAAAADMQ8\/y1Pk6x_44QU\/IMG_20150330_175854275.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6132413068981494481\/6132413071321887170' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-6f9SZBJueVo\/VRq1MowaccI\/AAAAAAADMQ8\/h9Tp48W77p0\/IMG_20150330_180127025.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6132413068981494481\/6132413070624462738' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-Pd84rgbA43U\/VRq1MmKIl5I\/AAAAAAADMQ8\/zfFfJ_CYlZ4\/IMG_20150330_180041075.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6132413068981494481\/6132413072265146994' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-bIxrmDxBGRI\/VRq1MsRTcnI\/AAAAAAADMQ8\/GbpMSdjHyjU\/IMG_20150330_175955235.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6132413068981494481'>In Album Hill-Kleerup Kitchen &#8211; 2015-03-31<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/Fm5SXWJ6DQq'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cabinetry work is essentially complete &#8212; there&#39;s one more back by the double-windows to put in (now that the crew has trimmed up the window), and there&#39;s some crown molding work still to do, and one panel that needs to be added, and all the cabinets and drawers need to be vacuumed out, and the &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/03\/31\/kitchen-project-day-145-the-bones-are-in-place.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 145: The Bones are in Place&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49965,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49964","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150330_175854275.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":138087,"url":"https:\/\/hill-kleerup.org\/blog\/2019\/03\/06\/kitchen-mis-design.html","url_meta":{"origin":49964,"position":0},"title":"Kitchen Mis-Design","author":"***Dave","date":"Wed 6-Mar-19 11:08pm","format":false,"excerpt":"The New Employer moved into this building last summer, everything all new-designed and spiffy and fresh. The kitchens are a disaster. They're huge, certainly -- forty feet long, a dozen feet wide. You could hold a small party in here. Entrances on either end, so traffic flow of that sort\u2026","rel":"","context":"In &quot;Architecture&quot;","block_context":{"text":"Architecture","link":"https:\/\/hill-kleerup.org\/blog\/category\/media\/architecture"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":51973,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/07\/28\/kitchen-project-day-265-exterior-touch-up.html","url_meta":{"origin":49964,"position":1},"title":"Kitchen Project &#8211; Day 265: Exterior Touch-Up","author":"***Dave","date":"Tue 28-Jul-15 7:58pm","format":false,"excerpt":"Things are going a bit slowly at the moment, though there has been progress made. The fence and gates are back up, and most (but not all) of the side yard grading and walls are complete. We're waiting on some inspection on the large retaining wall before we can polish\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49885,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/20\/kitchen-project-day-134-from-empty-to-full.html","url_meta":{"origin":49964,"position":2},"title":"Kitchen Project &#8211; Day 134: From Empty to Full","author":"***Dave","date":"Fri 20-Mar-15 4:04am","format":false,"excerpt":"Yesterday, I had a cavernous new, empty kitchen.Today, I have a kitchen (and dining room) full of boxes.Said boxes are our cabinets, which have been down in a warehouse in Colorado Springs for some months. They were delivered today, and Jim (the father-in-law) not only crossed off each one as\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150319_120500059_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150319_120500059_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150319_120500059_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":41558,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/03\/29\/kitchen-update-cabinetry.html","url_meta":{"origin":49964,"position":3},"title":"Kitchen Update: Cabinetry","author":"***Dave","date":"Sat 29-Mar-14 9:43am","format":false,"excerpt":"Went through the floor plan yesterday deciding on cabinetry. That sounds like a no-brainer, but is cause for some serious thought. \u00a0That section\u00a0there -- do you want a 6\" drawer with a cabinet beneath? \u00a0Should the cabinet have a couple of shelves -- pull-out or fixed? \u00a0Or maybe two 6\"\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/03\/another-country-kitchen%5B1%5D.jpg.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51380,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/05\/kitchen-project-day-212-everything-is-handled.html","url_meta":{"origin":49964,"position":4},"title":"Kitchen Project &#8211; Day 212: Everything Is Handled","author":"***Dave","date":"Fri 5-Jun-15 8:59pm","format":false,"excerpt":"So not much new news this past week. The beveridge fridge was delivered -- and determined to be not the right beveridge fridge, per an error at the warehouse. New beveridge fridge delivery date TBD.The outlet for the range hood was properly installed. Range hood to be installed and properly\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150604_113153936_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49924,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/23\/kitchen-project-day-138-cabinetapalooza-day-4.html","url_meta":{"origin":49964,"position":5},"title":"Kitchen Project &#8211; Day 138: Cabinetapalooza Day 4","author":"***Dave","date":"Mon 23-Mar-15 11:37pm","format":false,"excerpt":"More cabinets filling in around the sink, plus the frame around the eventual refrigerator. Jim did most of the work today, as I joined in as (mutter-mutter-go-live-mutter-mutter) work demands dragged me away.Very pleased with the progress, and look, so far. \u00a0\u00a0 In Album Hill-Kleerup Kitchen - 2015-03-23 View on Google+","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150323_183124156.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150323_183124156.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150323_183124156.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49964"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49964\/revisions"}],"predecessor-version":[{"id":50562,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49964\/revisions\/50562"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49965"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49964"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49964"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}