{"id":49982,"date":"2015-04-04T09:44:51","date_gmt":"2015-04-04T15:44:51","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/04\/04\/kitchen-project-day-146-all-tidied-up.html"},"modified":"2015-05-07T14:52:27","modified_gmt":"2015-05-07T20:52:27","slug":"kitchen-project-day-146-all-tidied-up","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/04\/04\/kitchen-project-day-146-all-tidied-up.html","title":{"rendered":"Kitchen Project &#8211; Day 146: All Tidied Up"},"content":{"rendered":"<p>No new or exciting news the past few days, so I thought I&#39;d run these pix from last Tuesday that show the post-cabinet-install status, after everything got cleaned up (mostly by Jim and Ginger, since I was <i>still<\/i> heads-down in office work, dagnabbit). There is still some fill-in to do &#8212; some trim and spacers and crown molding to be completed once some additional pieces arrive, as well as some additional nail setting and a bit of putty work &#8212; but here&#39;s where we are.<\/p>\n<p>Well, in the past few days Alex has been in doing painting of the trim, as well as some work in the basement. More on that anon.<\/p>\n<p>Countertop template folk arrive on Monday.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6133909697017745089\/6133909695133996626'><img src='https:\/\/lh3.googleusercontent.com\/-7CYttMSiKOg\/VSAGXm7JVlI\/AAAAAAADMas\/JZwYNqccBDo\/IMG_20150331_130829982.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6133909697017745089\/6133909696610100754' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-AT4nmtiEIAw\/VSAGXsbE5hI\/AAAAAAADMas\/R2znAyezwx8\/IMG_20150331_130936652.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6133909697017745089\/6133909696281143282' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-qrQ8Qthprzc\/VSAGXrMpZ_I\/AAAAAAADMas\/ETIYS36Uc9I\/IMG_20150331_130812040.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6133909697017745089\/6133909695908783474' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-MR7l_znGIlE\/VSAGXpz3pXI\/AAAAAAADMas\/pBHm37AhL4w\/IMG_20150331_130922307.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6133909697017745089\/6133909695295536082' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-1b_ZTtOQsM4\/VSAGXnhqO9I\/AAAAAAADMas\/pQmdtKnygZg\/IMG_20150331_130905218.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6133909697017745089\/6133909696293432962' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-sNXqTprmbz8\/VSAGXrPk7oI\/AAAAAAADMas\/1cLNywYi608\/IMG_20150331_130913365.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6133909697017745089'>In Album Hill-Kleerup Kitchen &#8211; 2015-03-31<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/dx61bNrvwcQ'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>No new or exciting news the past few days, so I thought I&#39;d run these pix from last Tuesday that show the post-cabinet-install status, after everything got cleaned up (mostly by Jim and Ginger, since I was still heads-down in office work, dagnabbit). There is still some fill-in to do &#8212; some trim and spacers &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/04\/04\/kitchen-project-day-146-all-tidied-up.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 146: All Tidied Up&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":49983,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-49982","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150331_130829982.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":51302,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/30\/kitchen-project-day-206-something-is-missing-here.html","url_meta":{"origin":49982,"position":0},"title":"Kitchen Project &#8211; Day 206: Something Is Missing Here","author":"***Dave","date":"Sat 30-May-15 12:42am","format":false,"excerpt":"Oh, yeah, that would be the upper oven. The highly prized (and pricey) Miele Combi-Steam\/Convection Oven, which Margie has been jonesing for a long time now.It was delivered on Thursday. Which is cool, except ...1. The outlet installed by the electricians was the wrong NEPA 6\/20. (It needed to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150529_190635807_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49718,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/01\/kitchen-project-day-115-bay-window.html","url_meta":{"origin":49982,"position":1},"title":"Kitchen Project &#8211; Day 115: Bay Window!","author":"***Dave","date":"Sun 1-Mar-15 6:35pm","format":false,"excerpt":"The bay window for the kitchen was installed on Saturday. The trim isn't completely finished, but I think it looks pretty good. \u00a0\u00a0\u00a0 In Album Hill-Kleerup Kitchen - 2015-02-28 View on Google+","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150301_131508522_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49957,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-144-islands-and-peninsula.html","url_meta":{"origin":49982,"position":2},"title":"Kitchen Project &#8211; Day 144: Islands and Peninsula","author":"***Dave","date":"Sun 29-Mar-15 8:26pm","format":false,"excerpt":"Next up: an Isthmus!We completed the island (save some decorative panels), and put up the rest of the wall cabinets where the peninsula will be. Also we laid down the foundation for the peninsula. Woot!Also, crown molding. Lots of crown molding. Tomorrow -- building the peninsula, adding some paneling, putting\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150329_180519398_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150329_180519398_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150329_180519398_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51610,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/25\/kitchen-project-day-232-a-few-major-accomplishments.html","url_meta":{"origin":49982,"position":3},"title":"Kitchen Project &#8211; Day 232: A few major accomplishments","author":"***Dave","date":"Thu 25-Jun-15 7:30am","format":false,"excerpt":"FLOOR! WE HAVE FLOOR! WOOT!The installers were here for most of the day, installing the cork floor, and it looks and feels fabulous. I've already confirmed with the appliance folk that we can take delivery of the fridge and range next week.There are a few gotchas, mostly around the T-strip\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150624_173755949.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49970,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/31\/kitchen-project-day-146-and-now-a-moment-of-silence.html","url_meta":{"origin":49982,"position":4},"title":"Kitchen Project &#8211; Day 146: And Now, a Moment of Silence","author":"***Dave","date":"Tue 31-Mar-15 10:29pm","format":false,"excerpt":"So ... Jim the Father-in-Law has flown off, having contributed an inestimable amount toward getting the cabinetry in shape (with much assist from his lovely assistance, Ginger, the Mother-in-Law, and far too little assist from Me, the Guy Whose Big Project Has Had Two Go-Lives In As Many Weeks). The\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150331_174812645_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51102,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/13\/kitchen-project-day-189-manic-and-depressive.html","url_meta":{"origin":49982,"position":5},"title":"Kitchen Project: Day 189 &#8211; Manic and Depressive","author":"***Dave","date":"Wed 13-May-15 11:10pm","format":false,"excerpt":"Really, if you want to feel what it's like to suffer from manic-depressive disorder, do a major home remodeling project, preferably a kitchen. I find my mood swings wildly depending on what went well or what didn't on any given day.What went well today - I finished up two pieces\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150513_112001377_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=49982"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49982\/revisions"}],"predecessor-version":[{"id":50541,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/49982\/revisions\/50541"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/49983"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=49982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=49982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=49982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}