{"id":50015,"date":"2015-04-07T22:55:07","date_gmt":"2015-04-08T04:55:07","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/04\/07\/kitchen-project-day-153-i-can-see-clearly-now.html"},"modified":"2015-05-07T07:00:50","modified_gmt":"2015-05-07T13:00:50","slug":"kitchen-project-day-153-i-can-see-clearly-now","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/04\/07\/kitchen-project-day-153-i-can-see-clearly-now.html","title":{"rendered":"Kitchen Project &#8211; Day 153: I Can See Clearly Now!"},"content":{"rendered":"<p>And &#8230; the plastic sheeting is down between the breakfast room and the kitchen. Woot!  We have a whole house again, even if we can&#39;t use part of it!<\/p>\n<p>Actually, with that tarp down, the kitchen seems <i>huge.<\/i><\/p>\n<p>The countertop template folk came today, and everything seems the way it&#39;s supposed to be, with no glances askance or widened eyes in horror.  Yay.  Not sure of the due date for delivery and install, but that&#39;s a step in the right direction.<\/p>\n<p>The various cardboard boxes of most of the cabinets are off to the recycler. I feel virtuous.<\/p>\n<p>Painting is pretty much done upstairs and down, and it looks good.<\/p>\n<p>This and that is still to be done on the punch list, but right now we&#39;re mostly in a holding pattern for the countertops.<\/p>\n<p>Now to get back in the habit of existing the breakfast room from the family room side &#8230;<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6135225929488031681\/6135225932161147538'><img src='https:\/\/lh3.googleusercontent.com\/-MzL9knM2xKs\/VSSzer864pI\/AAAAAAADMiI\/r8gtG2r3sOQ\/IMG_20150407_174327946_HDR.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6135225929488031681\/6135225931279591362' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-XgFF0VYbfA0\/VSSzeoqvZ8I\/AAAAAAADMiI\/sX1ZeFExs-s\/IMG_20150406_081915988.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6135225929488031681\/6135225929079587714' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-Ak5rta-m-7A\/VSSzegeOA4I\/AAAAAAADMiI\/ENpQlw8C5cY\/IMG_20150406_064338512.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6135225929488031681\/6135225931214384594' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-ZHBW0Ghd9Hc\/VSSzeobMbdI\/AAAAAAADMiI\/6WvNH03z_Vw\/IMG_20150406_064327203.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6135225929488031681'>In Album Hill-Kleerup Kitchen &#8211; 2015-04-07<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/B45YF5sZGJi'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>And &#8230; the plastic sheeting is down between the breakfast room and the kitchen. Woot! We have a whole house again, even if we can&#39;t use part of it! Actually, with that tarp down, the kitchen seems huge. The countertop template folk came today, and everything seems the way it&#39;s supposed to be, with no &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/04\/07\/kitchen-project-day-153-i-can-see-clearly-now.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 153: I Can See Clearly Now!&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":50016,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-50015","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150407_174327946_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":127897,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/09\/07\/kitchen-project-day-306-laboring-day-weekend.html","url_meta":{"origin":50015,"position":0},"title":"Kitchen Project &#8211; Day 306: Laboring Day Weekend","author":"***Dave","date":"Mon 7-Sep-15 9:37pm","format":false,"excerpt":"I'm just about ready to call the project complete. I did a load of work outside on getting the yard in shape (though that's an effort that will last into the spring, obviously), but, more importantly, we hit some major milestones this weekend:1. We entertained a huge crowd. The kitchen\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/09\/IMG_20150907_131831680.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/09\/IMG_20150907_131831680.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/09\/IMG_20150907_131831680.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49877,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/19\/my-father-in-law-is-playing-tetris-with-kitchen-cabinet-boxes-being-brought-in-finding-space-in-the-kitchen-and-dining-room.html","url_meta":{"origin":50015,"position":1},"title":"My father-in-law is playing Tetris with kitchen cabinet boxes being brought in, finding space in the kitchen and dining room.","author":"***Dave","date":"Thu 19-Mar-15 11:35am","format":false,"excerpt":"My father-in-law is playing Tetris with kitchen cabinet boxes being brought in, finding space in the kitchen and dining room. View on Twitter","rel":"","context":"In &quot;~Tweets&quot;","block_context":{"text":"~Tweets","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/tweets"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":13514,"url":"https:\/\/hill-kleerup.org\/blog\/2008\/11\/24\/home_improvement_gremlins.html","url_meta":{"origin":50015,"position":2},"title":"Home Improvement Gremlins","author":"***Dave","date":"Mon 24-Nov-08 8:40pm","format":false,"excerpt":"We decided not to do any Big Projects while Jim & Ginger were out this time. Instead, we pulled up a list of little things ... most of which Jim...","rel":"","context":"In &quot;Home Improvement&quot;","block_context":{"text":"Home Improvement","link":"https:\/\/hill-kleerup.org\/blog\/category\/home-improvement"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8491,"url":"https:\/\/hill-kleerup.org\/blog\/2005\/10\/31\/staying_at_hube.html","url_meta":{"origin":50015,"position":3},"title":"Staying at Hubert&#8217;s Place","author":"***Dave","date":"Mon 31-Oct-05 11:43am","format":false,"excerpt":"The B&B we stayed at in Grand Junction was actually in the adjoining community of Palisade -- Hubert's Place. It was a fine experience I wouldn't mind repeating. Unlike a...","rel":"","context":"In &quot;Travel&quot;","block_context":{"text":"Travel","link":"https:\/\/hill-kleerup.org\/blog\/category\/travel"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.hill-kleerup.org\/blog\/images\/hubertsplace.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":138087,"url":"https:\/\/hill-kleerup.org\/blog\/2019\/03\/06\/kitchen-mis-design.html","url_meta":{"origin":50015,"position":4},"title":"Kitchen Mis-Design","author":"***Dave","date":"Wed 6-Mar-19 11:08pm","format":false,"excerpt":"The New Employer moved into this building last summer, everything all new-designed and spiffy and fresh. The kitchens are a disaster. They're huge, certainly -- forty feet long, a dozen feet wide. You could hold a small party in here. Entrances on either end, so traffic flow of that sort\u2026","rel":"","context":"In &quot;Architecture&quot;","block_context":{"text":"Architecture","link":"https:\/\/hill-kleerup.org\/blog\/category\/media\/architecture"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2019\/03\/work-kitchen.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":51973,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/07\/28\/kitchen-project-day-265-exterior-touch-up.html","url_meta":{"origin":50015,"position":5},"title":"Kitchen Project &#8211; Day 265: Exterior Touch-Up","author":"***Dave","date":"Tue 28-Jul-15 7:58pm","format":false,"excerpt":"Things are going a bit slowly at the moment, though there has been progress made. The fence and gates are back up, and most (but not all) of the side yard grading and walls are complete. We're waiting on some inspection on the large retaining wall before we can polish\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150714_155653491.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/50015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=50015"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/50015\/revisions"}],"predecessor-version":[{"id":50517,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/50015\/revisions\/50517"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/50016"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=50015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=50015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=50015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}