{"id":50509,"date":"2015-05-07T04:47:12","date_gmt":"2015-05-07T10:47:12","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/05\/07\/kitchen-project-day-182.html"},"modified":"2015-05-07T16:21:14","modified_gmt":"2015-05-07T22:21:14","slug":"kitchen-project-day-182","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/07\/kitchen-project-day-182.html","title":{"rendered":"Kitchen Project: Day 182"},"content":{"rendered":"<p>So not a huge amount of progress lately, but we got the pendants hung over the island, and the tile extension to the new boundary of the kitchen put in, and a stray panel of wood to cover a cabinet side placed.<\/p>\n<p>Tomorrow is a big day: the backsplash gets installed. Also, we get to be Mean Customers to the countertop folk who placed the cut-out in the quartz of the island in the wrong place. Which is going to cost them a pretty penny, but given the countertops are costing <i>us<\/i> a pretty penny, and it was clearly their fault from multiple angles, there;s no question about it.<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6145985150006669217\/6145985151573565874'><img src='https:\/\/lh3.googleusercontent.com\/-yJ32lMMtYJM\/VUrs7rpeIbI\/AAAAAAADOEE\/-aKK20n53zM\/IMG_20150505_141432306.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6145985150006669217\/6145985151970858034' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-7Qts-wQpZoQ\/VUrs7tIMVDI\/AAAAAAADOEE\/pAWWJb7ails\/IMG_20150505_141513822_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6145985150006669217\/6145985152188164242' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-6gj62WHJe7s\/VUrs7t8AKJI\/AAAAAAADOEE\/xZEAX8Y5uCo\/IMG_20150505_143158700.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6145985150006669217\/6145985151007778482' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-S2HmOaXA-hc\/VUrs7pik5rI\/AAAAAAADOEE\/X37YAoSOOdw\/IMG_20150506_162909738_HDR.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6145985150006669217'>In Album Hill-Kleerup Kitchen &#8211; 2015-05-06<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/YLAwGZzq1aP'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>So not a huge amount of progress lately, but we got the pendants hung over the island, and the tile extension to the new boundary of the kitchen put in, and a stray panel of wood to cover a cabinet side placed. Tomorrow is a big day: the backsplash gets installed. Also, we get to &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/05\/07\/kitchen-project-day-182.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project: Day 182&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":50510,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-50509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150505_141432306.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49997,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/04\/01\/margies-kitchen-long-island-ice-tea.html","url_meta":{"origin":50509,"position":0},"title":"Margie&#8217;s Kitchen: Long Island Ice Tea","author":"***Dave","date":"Wed 1-Apr-15 3:25pm","format":false,"excerpt":"Margie's Kitchen: Long Island Ice Tea http:\/\/bit.ly\/1xZf0m7 #recipe View on Twitter","rel":"","context":"In &quot;~Tweets&quot;","block_context":{"text":"~Tweets","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/tweets"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":39870,"url":"https:\/\/hill-kleerup.org\/blog\/2013\/12\/02\/kitchen-in-the-garage.html","url_meta":{"origin":50509,"position":1},"title":"Kitchen in the Garage","author":"***Dave","date":"Mon 2-Dec-13 10:39pm","format":false,"excerpt":"Margie and Jim mapped out how the kitchen expansion will look by drawing on the floor of the garage in chalk (with an actual folding table for the island in the middle). \u00a0(The stove is at the center of the far end, by the garage door.)It was actually pretty cool,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":50188,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/04\/27\/kitchen-project-day-173-countertops.html","url_meta":{"origin":50509,"position":2},"title":"Kitchen Project &#8211; Day 173: Countertops!","author":"***Dave","date":"Mon 27-Apr-15 10:36pm","format":false,"excerpt":"Whew!The Good: The quartz countertops (Cambria, Bristol Blue) are fabulous. They look just the way I wanted. They provide some darkness to offset the cabinets, and they provide a blue cast that complements the browns of everything.I can't tell you how good they look in person. Now it's looking like\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150427_205334228_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150427_205334228_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150427_205334228_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51647,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/30\/the-kitchen-essential-we-forgot-in-our-renovation.html","url_meta":{"origin":50509,"position":3},"title":"The Kitchen Essential we forgot in our renovation","author":"***Dave","date":"Tue 30-Jun-15 10:38pm","format":false,"excerpt":"And here we wasted all that space on an island. Originally shared by +Daf Griffiths: No modern kitchen is complete without one... \u00a0 View on Google+","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/2015%2B-%2B1imgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49941,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/27\/kitchen-project-day-141-part-2.html","url_meta":{"origin":50509,"position":4},"title":"Kitchen Project &#8211; Day 141: Part 2","author":"***Dave","date":"Fri 27-Mar-15 6:05am","format":false,"excerpt":"Jim and I put a lot of the doors on prior to the ladies arriving from their SoCal sojourn this past week. We also got some cabinets put up on the wall shared with the dining room -- the rest of that wall, including the peninsula, will be the last\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150326_183355138.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150326_183355138.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150326_183355138.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49955,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/29\/kitchen-project-day-143-of-ovens-and-islands.html","url_meta":{"origin":50509,"position":5},"title":"Kitchen Project &#8211; Day 143: Of Ovens and Islands","author":"***Dave","date":"Sun 29-Mar-15 3:26am","format":false,"excerpt":"No report yesterday because there was not a lot to see, but today ...One of the more daunting elements to the kitchen cabinet install was the oven cabinet, which weighs an ungodly amount, needed to be custom-cut, and, oh yeah, weighs an ungodly amount. If there was going to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150328_170737217_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/50509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=50509"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/50509\/revisions"}],"predecessor-version":[{"id":50575,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/50509\/revisions\/50575"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/50510"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=50509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=50509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=50509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}