{"id":51126,"date":"2015-05-15T09:34:14","date_gmt":"2015-05-15T15:34:14","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/05\/15\/kitchen-project-day-190-sink-the-sequel.html"},"modified":"2015-05-15T11:39:18","modified_gmt":"2015-05-15T17:39:18","slug":"kitchen-project-day-190-sink-the-sequel","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/15\/kitchen-project-day-190-sink-the-sequel.html","title":{"rendered":"Kitchen Project &#8211; Day 190: Sink! (the Sequel)"},"content":{"rendered":"<p>Countertop guys returned and got the sink on the island installed. That provided an opportunity to do some cabinet work to accommodate the popup outlet that sits near it.<\/p>\n<p>Based on this, we can now get finish plumbing installed in the kitchen, which should happen early next week: getting faucets and disposals and water\/drain piping all installed and working, as well as hooking up the dishwasher. In another week we&#39;ll have functionality starting to return to the kitchen, huzzah!<\/p>\n<p>I had a series of chats with the GC and we&#39;re working toward solutions with the range hood. We also need to adjust some of the wiring in the oven cabinet to accommodate the ovens.  That&#39;s all probably going to kick off on Monday, along with some other finish electrical.<\/p>\n<p>Making progress!<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6149120770111895953\/6149120770040515538'><img src='https:\/\/lh3.googleusercontent.com\/-w4moJ0MXcgs\/VVYQwss9y9I\/AAAAAAADRxg\/STpnEqu4T8A\/IMG_20150514_164232316.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6149120770111895953\/6149120768715588386' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-C4RZ5CmoaOI\/VVYQwnxFAyI\/AAAAAAADRxg\/ADtJjqBqIbM\/IMG_20150514_164214976_HDR.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6149120770111895953'>In Album 2015-05-15<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/2UTEddAoUn4'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Countertop guys returned and got the sink on the island installed. That provided an opportunity to do some cabinet work to accommodate the popup outlet that sits near it. Based on this, we can now get finish plumbing installed in the kitchen, which should happen early next week: getting faucets and disposals and water\/drain piping &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/05\/15\/kitchen-project-day-190-sink-the-sequel.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 190: Sink! (the Sequel)&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":51127,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-51126","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150514_164232316.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49797,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/10\/kitchen-project-day-124-bits-and-pieces.html","url_meta":{"origin":51126,"position":0},"title":"Kitchen Project &#8211; Day 124: Bits and Pieces","author":"***Dave","date":"Tue 10-Mar-15 5:50am","format":false,"excerpt":"So as far as Things Actually Happening, today was Insulation Day -- batting installed in ceilings (mostly), with blow-in installed in the exterior walls, which almost looks like drywall.Almost more interesting is the various decision points +Margie Kleerup and I are working through ...- Tracking down what paint things should\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150309_170331820_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150309_170331820_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150309_170331820_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51102,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/13\/kitchen-project-day-189-manic-and-depressive.html","url_meta":{"origin":51126,"position":1},"title":"Kitchen Project: Day 189 &#8211; Manic and Depressive","author":"***Dave","date":"Wed 13-May-15 11:10pm","format":false,"excerpt":"Really, if you want to feel what it's like to suffer from manic-depressive disorder, do a major home remodeling project, preferably a kitchen. I find my mood swings wildly depending on what went well or what didn't on any given day.What went well today - I finished up two pieces\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150513_112001377_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49651,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/23\/kitchen-project-day-110-the-final-footprint-plus-sink.html","url_meta":{"origin":51126,"position":2},"title":"Kitchen Project &#8211; Day 110: The Final Footprint, plus Sink!","author":"***Dave","date":"Mon 23-Feb-15 8:41pm","format":false,"excerpt":"(Sorry for the dearth of other blogging. I'm sick. But house projects march on.)They knocked out the final bits of former wall that are going away, and now the full floor space of the New Kitchen stands revealed. Huzzah!Also, our garage sink is installed and working. Huzzah!(Okay, need to go\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150223_163800625_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150223_163800625_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150223_163800625_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":50188,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/04\/27\/kitchen-project-day-173-countertops.html","url_meta":{"origin":51126,"position":3},"title":"Kitchen Project &#8211; Day 173: Countertops!","author":"***Dave","date":"Mon 27-Apr-15 10:36pm","format":false,"excerpt":"Whew!The Good: The quartz countertops (Cambria, Bristol Blue) are fabulous. They look just the way I wanted. They provide some darkness to offset the cabinets, and they provide a blue cast that complements the browns of everything.I can't tell you how good they look in person. Now it's looking like\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150427_205334228_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150427_205334228_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150427_205334228_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49970,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/31\/kitchen-project-day-146-and-now-a-moment-of-silence.html","url_meta":{"origin":51126,"position":4},"title":"Kitchen Project &#8211; Day 146: And Now, a Moment of Silence","author":"***Dave","date":"Tue 31-Mar-15 10:29pm","format":false,"excerpt":"So ... Jim the Father-in-Law has flown off, having contributed an inestimable amount toward getting the cabinetry in shape (with much assist from his lovely assistance, Ginger, the Mother-in-Law, and far too little assist from Me, the Guy Whose Big Project Has Had Two Go-Lives In As Many Weeks). The\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150331_174812645_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49236,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/01\/11\/kitchen-project-day-67-prepping-the-garage-kitchen.html","url_meta":{"origin":51126,"position":5},"title":"Kitchen Project &#8211; Day 67: Prepping the Garage Kitchen","author":"***Dave","date":"Sun 11-Jan-15 1:27pm","format":false,"excerpt":"Not a lot of outside progress to show, as the contractor has been having problems with crews on another job and is trying to get that situation in hand before getting the framing started on our end. In the interim, since in theory the kitchen goes \"down\" in 2-3 weeks,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/01\/IMG_20150111_123707720_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=51126"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51126\/revisions"}],"predecessor-version":[{"id":51157,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51126\/revisions\/51157"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/51127"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=51126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=51126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=51126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}