{"id":51380,"date":"2015-06-05T20:59:44","date_gmt":"2015-06-06T02:59:44","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/06\/05\/kitchen-project-day-212-everything-is-handled.html"},"modified":"2015-08-21T15:22:03","modified_gmt":"2015-08-21T21:22:03","slug":"kitchen-project-day-212-everything-is-handled","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/05\/kitchen-project-day-212-everything-is-handled.html","title":{"rendered":"Kitchen Project &#8211; Day 212: Everything Is Handled"},"content":{"rendered":"<p>So not much new news this past week. <\/p>\n<p>The beveridge fridge was delivered &#8212; and determined to be not the <i>right<\/i> beveridge fridge, per an error at the warehouse. New beveridge fridge delivery date TBD.<\/p>\n<p>The outlet for the range hood was properly installed. Range hood to be installed and properly wired some time next week.<\/p>\n<p>We looked at some alternative flooring sources, but didn&#39;t see anything that wowed us enough to change out our (twice-delayed) order at Carpet Exchange, which is currently a week out from delivery.<\/p>\n<p>Upon which we can then schedule delivery of the fridge and the range. Hopefully the right ones will show up, undamaged, of <i>those.<\/i><\/p>\n<p>This weekend we&#39;ll be working on installing carpet squares in the new basement room, so we can start moving stuff over into it.<\/p>\n<p>Next week we expect a bunch of punch-list items to be worked on by the contractor.<\/p>\n<p>My back-up order of handles (Amerock Riva) arrived and were installed, so we are all fully handled. Some of the cabinets and drawers still need adjustment, but &#8230;<\/p>\n<p>I wrote up (from notes taken in January-February) a series of Post-It notes with all the categories of Stuff that go in the kitchen (and surrounding environs). These are ready to be stuck on various drawers and cabinets, so as to get ready for moving stuff in. Which, for some stuff, we could actually do at any time &#8230;<\/p>\n<p>&#8230; which is actually kind of exciting!<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6157089470620704561\/6157089470504917970'><img src='https:\/\/lh3.googleusercontent.com\/-ah7DyMyTJMk\/VXJgQHO-W9I\/AAAAAAADTHU\/O9jsTh8y43g\/IMG_20150604_113153936_HDR.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6157089470620704561\/6157089470711515570' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-rHwTtjU0gjM\/VXJgQIAOybI\/AAAAAAADTHU\/ySOODMOdUjw\/IMG_20150605_143455088.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6157089470620704561\/6157089472191340642' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-5D5PAhtWvsA\/VXJgQNhDIGI\/AAAAAAADTHU\/DCq3mh1Xgn4\/IMG_20150605_143514913_HDR.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6157089470620704561?authkey=CP-7nJ2z65CJ4wE'>In Album Hill-Kleerup Kitchen &#8211; 2015-06-05<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/7XvTicwwzgY'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>So not much new news this past week. The beveridge fridge was delivered &#8212; and determined to be not the right beveridge fridge, per an error at the warehouse. New beveridge fridge delivery date TBD. The outlet for the range hood was properly installed. Range hood to be installed and properly wired some time next &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/06\/05\/kitchen-project-day-212-everything-is-handled.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 212: Everything Is Handled&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":51381,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-51380","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150604_113153936_HDR.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":51658,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/07\/02\/kitchen-project-day-239-home-home-with-a-range.html","url_meta":{"origin":51380,"position":0},"title":"Kitchen Project &#8211; Day 239: Home, Home with a Range!","author":"***Dave","date":"Thu 2-Jul-15 7:49pm","format":false,"excerpt":"Yes, they said it would never happen -- but today it did! We now have a range, a refrigerator, and, essentially, all of our appliances installed and (largely) operational!The range is a big six-burner GE Monogram (ZDP366NPSS), with a humongous oven. We are inaugurating it with a pizza and cookies\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150702_140919406_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51302,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/30\/kitchen-project-day-206-something-is-missing-here.html","url_meta":{"origin":51380,"position":1},"title":"Kitchen Project &#8211; Day 206: Something Is Missing Here","author":"***Dave","date":"Sat 30-May-15 12:42am","format":false,"excerpt":"Oh, yeah, that would be the upper oven. The highly prized (and pricey) Miele Combi-Steam\/Convection Oven, which Margie has been jonesing for a long time now.It was delivered on Thursday. Which is cool, except ...1. The outlet installed by the electricians was the wrong NEPA 6\/20. (It needed to be\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150529_190635807_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51610,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/25\/kitchen-project-day-232-a-few-major-accomplishments.html","url_meta":{"origin":51380,"position":2},"title":"Kitchen Project &#8211; Day 232: A few major accomplishments","author":"***Dave","date":"Thu 25-Jun-15 7:30am","format":false,"excerpt":"FLOOR! WE HAVE FLOOR! WOOT!The installers were here for most of the day, installing the cork floor, and it looks and feels fabulous. I've already confirmed with the appliance folk that we can take delivery of the fridge and range next week.There are a few gotchas, mostly around the T-strip\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150624_173755949.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51406,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/08\/kitchen-project-day-215-drinks-are-on-us.html","url_meta":{"origin":51380,"position":3},"title":"Kitchen Project &#8211; Day 215: Drinks are on us!","author":"***Dave","date":"Mon 8-Jun-15 6:23pm","format":false,"excerpt":"So two not-insignificant occurrences the past few days.1. Jim and I carpeted the new basement room, using carpet squares from Home Depot (Soft Collection - Tranquility - Mountain Mist, for the record). Went fast and easy, and we've bought enough additional to (over time) recarpet the basement.Now that's done, the\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150606_155428256.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150606_155428256.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150606_155428256.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51165,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/05\/16\/kitchen-project-day-191-electric-touches.html","url_meta":{"origin":51380,"position":4},"title":"Kitchen Project &#8211; Day 191: Electric Touches","author":"***Dave","date":"Sat 16-May-15 2:10am","format":false,"excerpt":"The finish electrical isn't yet finished, but we made progress this afternoon. We got one of the two oven bays properly outletted (the one that's scheduled for Wednesday delivery). We got the pop-up outlet on the peninsula installed and powered up. Those were the easy parts.The range hood remains a\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/05\/IMG_20150515_155318315_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":41558,"url":"https:\/\/hill-kleerup.org\/blog\/2014\/03\/29\/kitchen-update-cabinetry.html","url_meta":{"origin":51380,"position":5},"title":"Kitchen Update: Cabinetry","author":"***Dave","date":"Sat 29-Mar-14 9:43am","format":false,"excerpt":"Went through the floor plan yesterday deciding on cabinetry. That sounds like a no-brainer, but is cause for some serious thought. \u00a0That section\u00a0there -- do you want a 6\" drawer with a cabinet beneath? \u00a0Should the cabinet have a couple of shelves -- pull-out or fixed? \u00a0Or maybe two 6\"\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2014\/03\/another-country-kitchen%5B1%5D.jpg.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51380","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=51380"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51380\/revisions"}],"predecessor-version":[{"id":127597,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51380\/revisions\/127597"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/51381"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=51380"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=51380"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=51380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}