{"id":5148,"date":"2003-10-24T12:58:07","date_gmt":"2003-10-24T19:58:07","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/wp\/?p=5148"},"modified":"2003-10-24T12:58:07","modified_gmt":"2003-10-24T19:58:07","slug":"change_of_plans","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2003\/10\/24\/change_of_plans.html","title":{"rendered":"Change of plans"},"content":{"rendered":"<p>The laundry chute is right out, given the presence of heater ductwork in the wall that it was going to go through.  Ah, well.<\/p>\n<p>So, instead, cabinetry\/buffet in the dining room, at least Phase 1 thereof.  Details to follow &#8230;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The laundry chute is right out, given the presence of heater ductwork in the wall that it was going to go through. Ah, well. So, instead, cabinetry\/buffet in the dining&#8230;<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[19],"tags":[],"class_list":["post-5148","post","type-post","status-publish","format-standard","hentry","category-home-improvement"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":49617,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/18\/kitchen-project-day-105-part-2.html","url_meta":{"origin":5148,"position":0},"title":"Kitchen Project &#8211; Day 105 (Part 2)","author":"***Dave","date":"Wed 18-Feb-15 9:44pm","format":false,"excerpt":"So the previous post should have been Day 104, since it was for what happened yesterday. Ah, well.Today the roofers came and started working on tearing off the old shingles and replacing them, as well as papering the roof of the new kitchen extension.Further ductwork was ducted, and most of\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150218_151357889.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150218_151357889.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150218_151357889.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":5147,"url":"https:\/\/hill-kleerup.org\/blog\/2003\/10\/26\/progress_report.html","url_meta":{"origin":5148,"position":1},"title":"Progress report","author":"***Dave","date":"Sun 26-Oct-03 7:53am","format":false,"excerpt":"The dining room project is much bigger, but going much faster, than expected. Cabinetry, power outlets, down lights, drywall, ultimately tile surfacing that will match ultimate tile floor ... amazing....","rel":"","context":"In &quot;Home Improvement&quot;","block_context":{"text":"Home Improvement","link":"https:\/\/hill-kleerup.org\/blog\/category\/home-improvement"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":49547,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/11\/the-noises-coming-from-my-kitchen-as-they-tear-the-cabinetry-apart-are-truly-terrifying.html","url_meta":{"origin":5148,"position":2},"title":"The noises coming from my kitchen as they tear the cabinetry apart are truly terrifying.","author":"***Dave","date":"Wed 11-Feb-15 9:57am","format":false,"excerpt":"The noises coming from my kitchen as they tear the cabinetry apart are truly terrifying. View on Twitter","rel":"","context":"In &quot;~Tweets&quot;","block_context":{"text":"~Tweets","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/tweets"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":127551,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/08\/19\/kitchen-project-day-287-migratory-cabinetry.html","url_meta":{"origin":5148,"position":3},"title":"Kitchen Project  &#8211; Day 287: Migratory Cabinetry","author":"***Dave","date":"Wed 19-Aug-15 9:53pm","format":false,"excerpt":"Last weekend Jim and I got (mostly) installed the salvaged cabinetry from the Before kitchen into the basement. We still need to do some electrical work (moving a plug), and some countertop purchases, but by and large it's looking pretty good, and will add some new storage flexibility into the\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/08\/IMG_20150816_173908828.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/08\/IMG_20150816_173908828.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/08\/IMG_20150816_173908828.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":49970,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/03\/31\/kitchen-project-day-146-and-now-a-moment-of-silence.html","url_meta":{"origin":5148,"position":4},"title":"Kitchen Project &#8211; Day 146: And Now, a Moment of Silence","author":"***Dave","date":"Tue 31-Mar-15 10:29pm","format":false,"excerpt":"So ... Jim the Father-in-Law has flown off, having contributed an inestimable amount toward getting the cabinetry in shape (with much assist from his lovely assistance, Ginger, the Mother-in-Law, and far too little assist from Me, the Guy Whose Big Project Has Had Two Go-Lives In As Many Weeks). The\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/03\/IMG_20150331_174812645_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":49614,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/02\/18\/kitchen-project-day-105-duct-duct-goose.html","url_meta":{"origin":5148,"position":5},"title":"KItchen Project &#8211; Day 105: Duct, Duct, Goose","author":"***Dave","date":"Wed 18-Feb-15 12:53pm","format":false,"excerpt":"Two changes yesterday. First, the roofers came by (with their own skip, of course) and prepped the roof for replacing the shingles. These were the 30-year Hail-Resistant shingles that we put in two years ago, but which couldn't stand up to the hail storm we had at the end of\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150217_163954419_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150217_163954419_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/02\/IMG_20150217_163954419_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/5148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=5148"}],"version-history":[{"count":0,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/5148\/revisions"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=5148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=5148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=5148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}