{"id":51610,"date":"2015-06-25T07:30:18","date_gmt":"2015-06-25T13:30:18","guid":{"rendered":"http:\/\/hill-kleerup.org\/blog\/2015\/06\/25\/kitchen-project-day-232-a-few-major-accomplishments.html"},"modified":"2015-08-21T15:21:49","modified_gmt":"2015-08-21T21:21:49","slug":"kitchen-project-day-232-a-few-major-accomplishments","status":"publish","type":"post","link":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/25\/kitchen-project-day-232-a-few-major-accomplishments.html","title":{"rendered":"Kitchen Project &#8211; Day 232: A few major accomplishments"},"content":{"rendered":"<p>FLOOR! WE HAVE FLOOR! WOOT!<\/p>\n<p>The installers were here for most of the day, installing the cork floor, and it looks and feels fabulous. I&#39;ve already confirmed with the appliance folk that we can take delivery of the fridge and range next week.<\/p>\n<p>There are a few gotchas, mostly around the T-strip for the transition between the tile and the cork. One gotcha is that I managed to not order enough (don&#39;t ask me how). The other is that it didn&#39;t come with the installation rail that the installers were expecting. I have inquiries in on both points, though neither is enough to keep us from using the kitchen.<\/p>\n<p>The other thing, which happened earlier in the week, is the Miele steam\/convection oven finally got installed, which will make Margie very, very happy.<\/p>\n<p>Essentially, that leaves us with a couple of remaining appliances to get put in (see above), plus getting the range hood hook-up to the make-up air complete, and we&#39;re largely done except for the trim  and baseboards and the like. And we can start moving back into the kitchen &#8230;<\/p>\n<p>(There&#39;s also the sprinkler system and retaining walls in the side yard to be done, but that&#39;s a different challenge, and doesn&#39;t keep us out of the kitchen.)<\/p><\/blockquote>\n<div style='text-align:center'><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6164304124121336065\/6164304121441684498'><img src='https:\/\/lh3.googleusercontent.com\/-fHQ4t0VinPA\/VYwB8EYCDBI\/AAAAAAADUcU\/RXvTdbBIW_0\/IMG_20150624_173755949.jpg?imgmax=660' style='max-width:650px;' \/><\/a><\/div>\n<div style='text-align:center'>\n<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6164304124121336065\/6164304121064267954' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-Mpy2nNRF664\/VYwB8C-DILI\/AAAAAAADUcU\/9vs_RljwuYQ\/IMG_20150623_135720137_HDR.jpg?imgmax=300);'><\/a>\u00a0<a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6164304124121336065\/6164304124017933890' style='width:50px;height:50px;display:inline-block;background-size:cover;background-image:url(https:\/\/lh3.googleusercontent.com\/-yblOTf-U47c\/VYwB8N-QfkI\/AAAAAAADUcU\/43GbnmbQg2E\/IMG_20150624_103007525.jpg?imgmax=300);'><\/a>\u00a0\n<\/div>\n<p><\/p>\n<p><a href='https:\/\/plus.google.com\/photos\/101083456815352083930\/albums\/6164304124121336065'>In Album Hill-Kleerup Kitchen &#8211; 2015-06-25<\/a><\/p>\n<p><span style='font-size:small;'><a href='https:\/\/plus.google.com\/+DaveHill47\/posts\/XyEGoZyJZ8J'>View on Google+<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>FLOOR! WE HAVE FLOOR! WOOT! The installers were here for most of the day, installing the cork floor, and it looks and feels fabulous. I&#39;ve already confirmed with the appliance folk that we can take delivery of the fridge and range next week. There are a few gotchas, mostly around the T-strip for the transition &hellip; <a href=\"https:\/\/hill-kleerup.org\/blog\/2015\/06\/25\/kitchen-project-day-232-a-few-major-accomplishments.html\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kitchen Project &#8211; Day 232: A few major accomplishments&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":51611,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[106,438],"tags":[],"class_list":["post-51610","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plusposts","category-kitchen-remodel"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/IMG_20150624_173755949.jpgimgmax=660.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":51658,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/07\/02\/kitchen-project-day-239-home-home-with-a-range.html","url_meta":{"origin":51610,"position":0},"title":"Kitchen Project &#8211; Day 239: Home, Home with a Range!","author":"***Dave","date":"Thu 2-Jul-15 7:49pm","format":false,"excerpt":"Yes, they said it would never happen -- but today it did! We now have a range, a refrigerator, and, essentially, all of our appliances installed and (largely) operational!The range is a big six-burner GE Monogram (ZDP366NPSS), with a humongous oven. We are inaugurating it with a pizza and cookies\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/07\/IMG_20150702_140919406_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":51339,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/01\/kitchen-project-day-208-the-floor-drops-out.html","url_meta":{"origin":51610,"position":1},"title":"Kitchen Project &#8211; Day 208: The Floor Drops Out","author":"***Dave","date":"Mon 1-Jun-15 10:49pm","format":false,"excerpt":"On the plus side:- I have almost all of the cabinet and drawer pulls in place, and the remaining ones are bored and waiting for installation.- We've started planning the move back into the kitchen, with Many Post-It Notes to identify what should go where.On the minus side:- Dude from\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/success-really-looks-like5B15D.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/success-really-looks-like5B15D.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/06\/success-really-looks-like5B15D.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":51542,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/06\/18\/the-flooring-mirabile-dictu-has-finally-arrived.html","url_meta":{"origin":51610,"position":2},"title":"The flooring, mirabile dictu, has FINALLY arrived","author":"***Dave","date":"Thu 18-Jun-15 11:23am","format":false,"excerpt":"The flooring, mirabile dictu, has FINALLY arrived I was beginning to think they'd flown to Portugal to hand-harvest the cork. #kitchen View on Twitter","rel":"","context":"In &quot;~Tweets&quot;","block_context":{"text":"~Tweets","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/tweets"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":50157,"url":"https:\/\/hill-kleerup.org\/blog\/2015\/04\/25\/kitchen-project-day-170-incremental-progress.html","url_meta":{"origin":51610,"position":3},"title":"Kitchen Project &#8211; Day 170: Incremental Progress","author":"***Dave","date":"Sat 25-Apr-15 10:15am","format":false,"excerpt":"While I was gone, various small bits and bobs were done around the kitchen -- most of the lighting was installed (there are some things that need doing with the pendants before they can be hung), and progress was made on the tile for the floor (but not the rest\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150424_162621305_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150424_162621305_HDR.jpgimgmax%3D660.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/hill-kleerup.org\/blog\/wp\/wp-content\/uploads\/2015\/04\/IMG_20150424_162621305_HDR.jpgimgmax%3D660.jpg?resize=525%2C300&ssl=1 1.5x"},"classes":[]},{"id":9448,"url":"https:\/\/hill-kleerup.org\/blog\/2006\/07\/05\/all_wet_2.html","url_meta":{"origin":51610,"position":4},"title":"All wet","author":"***Dave","date":"Wed 5-Jul-06 2:25pm","format":false,"excerpt":"Finally got sprinkler guys out here to look at the two dead zones.\u00a0 One zone just needed a bit of jiggling on its wiring -- it's working great.\u00a0 The other,...","rel":"","context":"In &quot;Home Improvement&quot;","block_context":{"text":"Home Improvement","link":"https:\/\/hill-kleerup.org\/blog\/category\/home-improvement"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":39870,"url":"https:\/\/hill-kleerup.org\/blog\/2013\/12\/02\/kitchen-in-the-garage.html","url_meta":{"origin":51610,"position":5},"title":"Kitchen in the Garage","author":"***Dave","date":"Mon 2-Dec-13 10:39pm","format":false,"excerpt":"Margie and Jim mapped out how the kitchen expansion will look by drawing on the floor of the garage in chalk (with an actual folding table for the island in the middle). \u00a0(The stove is at the center of the far end, by the garage door.)It was actually pretty cool,\u2026","rel":"","context":"In &quot;~PlusPosts&quot;","block_context":{"text":"~PlusPosts","link":"https:\/\/hill-kleerup.org\/blog\/category\/blogging\/plusposts"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/comments?post=51610"}],"version-history":[{"count":1,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51610\/revisions"}],"predecessor-version":[{"id":127594,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/posts\/51610\/revisions\/127594"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media\/51611"}],"wp:attachment":[{"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/media?parent=51610"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/categories?post=51610"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hill-kleerup.org\/blog\/wp-json\/wp\/v2\/tags?post=51610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}