![](https://www.hill-kleerup.org/blog/images/a2c545f27b.jpg)
They’re almost done with redoing the deck waterproofing.
UPDATE: Upon returning home Sunday, they’ve completed the top of the deck, along with all the redwood fascia/trim, the cutting off of the corners, etc. Now for the railing …
this post enabled by airblogging.com.