https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 4

Needs more backhoe!

More progress in getting more dirt dug up. By the end of the day, the area for the extension of the new foundation was pretty well cleared out. Next up, as I understand it, will be getting the guys out to put in the helical piers that will keep the whole thing in place.

This week will be challenging for the project, as tomorrow we get some snow and rain in the afternoon, and temps dropping below freezing with sundown. and stays below freezing until, oh, Friday or so (with some more snow in the meantime). That won't necessarily prevent the piers being put in, or the forms being put together for the extended foundation, etc., but it will keep them from doing any concrete pouring until temps climb back up a bit — and temps don't look to be going up above 40 as far as the ten-day forecast can be counted on.

    

In Album Hill-Kleerup Kitchen – 2014-11-09

View on Google+

29 view(s)  

Leave a Reply

Your email address will not be published. Required fields are marked *