https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 75: Some Assembly Required

Lumber was dropped off yesterday for the kitchen/basement extension framing. I arrived home early from the office (for some late-evening phone calls), and found the delivery truck in front of the house, leaving off at least some percentage of the lumber going into the effort.

Framing is supposed to start today. (Again.) Pictures (if anything to pic) to follow.

  

In Album Hill-Kleerup Kitchen – 2015-01-19

View on Google+

69 view(s)  

One thought on “Kitchen Project – Day 75: Some Assembly Required”

Leave a Reply

Your email address will not be published. Required fields are marked *