https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

KItchen Project – Day 105: Duct, Duct, Goose

Two changes yesterday. First, the roofers came by (with their own skip, of course) and prepped the roof for replacing the shingles. These were the 30-year Hail-Resistant shingles that we put in two years ago, but which couldn't stand up to the hail storm we had at the end of September. That was true for a lot of folk in the neighborhood.

Anyway, we're using the same roofer as is doing the roofing on the kitchen extension, which will be saving us some money, and why it's getting mentioned in one of these posts.

Second going-on was the HVAC guy coming in to start putting in new ductwork for the kitchen and the basement extension.

Plans for the rest of this week is wrapping that up, plus the plumber beginning work (starting, I hope, with the garage sink) and getting the new extension wrapped and siding started. Once that happens, the wall to the kitchen can come down.

       

In Album Hill-Kleerup Kitchen – 2015-02-17

View on Google+

56 view(s)  

Leave a Reply

Your email address will not be published. Required fields are marked *