Jim and I put a lot of the doors on prior to the ladies arriving from their SoCal sojourn this past week. We also got some cabinets put up on the wall shared with the dining room — the rest of that wall, including the peninsula, will be the last ting we do.
We got the plywood put down on the floor for the base of the island, which was a big thing. The bigger thing still lurking is the oven cabinet, a massive and heavy unit that our two ovens will go into, and that needs a base assembled for it (and to be lifted onto same). Also proper holes cut out in front for the actual ovens we're buying, holes cut in back for the power outlets, and a steam stack into the attiic space for the steam oven.
That may be what we tackle next, before the island cuts down on our maneuvering room.
In Album Hill-Kleerup Kitchen – 2015-03-26a