https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 146: All Tidied Up

No new or exciting news the past few days, so I thought I'd run these pix from last Tuesday that show the post-cabinet-install status, after everything got cleaned up (mostly by Jim and Ginger, since I was still heads-down in office work, dagnabbit). There is still some fill-in to do — some trim and spacers and crown molding to be completed once some additional pieces arrive, as well as some additional nail setting and a bit of putty work — but here's where we are.

Well, in the past few days Alex has been in doing painting of the trim, as well as some work in the basement. More on that anon.

Countertop template folk arrive on Monday.

     

In Album Hill-Kleerup Kitchen – 2015-03-31

View on Google+

47 view(s)  

Leave a Reply

Your email address will not be published. Required fields are marked *