https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 112: LIghts! Water! Action!

Plumbing finished up Monday, running the drains and supply for the island, as well as the feed over to the refrigerator for the ice maker.

Today was electrical contractors, focusing initially on getting lighting fixtures up in the kitchen, but also beginning work around the sub-panel that will have to be added. We're putting in more lighting more plugs, an extra disposal, and a couple more ovens, so there are consequences.

As it was "Contrasting real world situation plus building code gotchas to beautiful architectural drawing" Day, it was sort of a busy morning in terms of deciding what was possible, what needed to be tweaked, etc. To paraphrase the military maxim, no blueprint survives the first encounter with what lies behind the drywall.

          

In Album Hill-Kleerup Kitchen – 2015-02-25

View on Google+

53 view(s)  

One thought on “Kitchen Project – Day 112: LIghts! Water! Action!”

Leave a Reply

Your email address will not be published. Required fields are marked *