So the first stuff with the kitchen project kicks off next week. These are some reference exterior photos of the house. The kitchen is in the back portion of the (eastern) side of the house shown (the stove vent is the white-painted bit on the wall there). That section is going to be extended out about eight feet, as far out as the living room in the front of the house extends. The basement is being similarly extended, and will be dug out so that it's a walk-out on that side. The kitchen will have a partially vaulted roof, which will pitch up opposite the living room roof. There will be about a ten foot gap between those two extending wings.
(I realize there's one more angle I need to take a picture from tomorrow.)
Anyway, that's how it looks now … I'll be adding pictures to the album as we get towards then. (I'll also start up a new album when we start doing things inside).
In Album Hill-Kleerup Kitchen Project 2014-2015 (exterior)
Your house is pumpkin-colored.
But you know that.
It's a bit browner than the photo makes it look. More of a pumpkin-spice.