Today was mostly a follow-up to the previous day, only in this case with an excavator to tackle some additional space and to finish getting the hole down to the point where the additional foundation can be added.
Between the hole and the space in front of it (for patio from the walk-out), and the huge mound of dirt resulting — there's not a lot of room. The team will be back onsite tomorrow, with a proper back-hoe to be able to both dig and carry dirt away.
In Album Hill-Kleerup Kitchen – 2014-11-07