https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project: Day 2

Today was mostly a follow-up to the previous day, only in this case with an excavator to tackle some additional space and to finish getting the hole down to the point where the additional foundation can be added.

Between the hole and the space in front of it (for patio from the walk-out), and the huge mound of dirt resulting — there's not a lot of room. The team will be back onsite tomorrow, with a proper back-hoe to be able to both dig and carry dirt away.

     

In Album Hill-Kleerup Kitchen – 2014-11-07

View on Google+

39 view(s)  

Leave a Reply

Your email address will not be published. Required fields are marked *