https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 8

Not much activity this week, since it's been so bitterly cold. Today the GC and Assistant came out to prep the excavation for helical piers to be sunk on Monday. These piers, down to the bedrock, will anchor the house addition and keep it from crashing down into the neighbor's yard, so it's a Good Thing.

The other activity was to extend out the slope down into the pit so that the pier excavator can get back out again after it does its work.

After that, then we start seeing forms built for the new foundation and slab and all that jazz. Then (once weather permits) concrete gets poured. Much concrete.

We reviewed another draft of the schedule, and things will start moving pretty quickly Real Soon Now.

( #WAWGANK is our new catch phrase around the household. "When Are We Getting A New Kitchen?")

  

In Album Hill-Kleerup Kitchen – 2014-11-14

View on Google+

46 view(s)  

2 thoughts on “Kitchen Project – Day 8”

Leave a Reply

Your email address will not be published. Required fields are marked *