https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 28: Total Rebar

A lot of these pictures are looking similar because progress has been incremental this week. Rebar put in, rebar taken out and put in again, rebar welded. So … here's the world of rebar.

The structural engineer was supposed to come by today and give his blessing on the piers and all, but he put it on his calendar wrong, so he's coming tomorrow instead. Also coming tomorrow is the city inspector to confirm that everything is all done up right for the concrete pour that is now scheduled for … Friday! Woot!

Timing is actually perfect, as the forecast for the next week is highs in the high 50s, lows just above or barely dipping below freezing, and no precipitation. That could change, of course, but it seems like a good opportunity for the concrete to go in, set, and dirt to start getting backfilled. Huzzah!

         

In Album Hill-Kleerup Kitchen – 2014-12-03

View on Google+

30 view(s)  

Leave a Reply

Your email address will not be published. Required fields are marked *