https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 34: Tales from the Crypt

Last day to see the full foundation (or to seal it from moisture), as Thursday/Friday will be backfill days, filling the hole and the surrounding bits with the dirt that's been left behind in the side yard and on the driveway. More progress!

+Kay Hill did a little bit of exploring of the construction. I got out quick, though, when she started quoting from "A Cask of Amontillado."

After the backfill, we'll be sinking the last helical pier, by the house (where the existing foundation will be broken into to put in a door to the new basement), and then pouring the slab. They'll actually be doing some cutting into the house after that (where the door will go), so that they can line up the new basement slab with the old basement slab.

Getting more excited …

      

In Album Hill-Kleerup Kitchen – 2014-10

View on Google+

77 view(s)  

6 thoughts on “Kitchen Project – Day 34: Tales from the Crypt”

Leave a Reply

Your email address will not be published. Required fields are marked *