https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 36: Basement Cleaning EXTREME!

So the existing basement gets impacted by the project with a door being punched through the existing foundation (behind the wainscoting) into the new basement room, as well as ceiling activity related to plumbing and HVAC for the kitchen above.

Since there will be a bit of initial demo in during the next week or so (to make sure that the new slab matches the old slab), we needed to clear the wall some, and while we were at it, we decided to get the majority of the downstairs clearing and getting-stuff-out-of-the-way that will be needed.

Mostly noteworthy for those who have seen the basement in various stages of clutter or clarity in the past.

          

In Album Hill-Kleerup Kitchen – 2014-12-14

View on Google+

86 view(s)  

One thought on “Kitchen Project – Day 36: Basement Cleaning EXTREME!”

Leave a Reply

Your email address will not be published. Required fields are marked *