https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 99: Gutted (even more)

The drywall is off. The wood flooring is pulled. Re-framing has commenced. Not sure when the wall, wall, wall comes down, down, down, but … soon, I suspect.

Subs are going to start coming in tomorrow and next week for the HVAC, electrical, and plumbing work to get more immediately scoped.

Also going on (though a bit less interesting at the moment) is interior framing in the basement extension, to deal with foundation ledges, crazy pier clamps, and the need for insulation.

      

In Album Hill-Kleerup Kitchen – 2015-02-12

View on Google+

74 view(s)  

2 thoughts on “Kitchen Project – Day 99: Gutted (even more)”

  1. A couple. The clearance wasn't all that high. But they are small light-weight ones, so the kitties are enjoying them.

    As to how many kitty treats … well, I'm just glad we have a dumpster out front …

Leave a Reply

Your email address will not be published. Required fields are marked *