https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

KItchen Project – Day 133: We Have a Room

Over the past few days the drywall has been finished, texture applied, and the first coats of paint put on. The kitchen is beginning to look like an honest-to-gosh (if kind of empty) room.

That starts to change tomorrow. Jim, the father-in-law, arrived today. He's going to be here through the end of the month. Tomorrow morning, the new cabinets arrive. They're going to be here for many years — once Jim and I start installing them. That's going to be an interesting tale. (Especially since I need to split my time with overseeing two different go-lives on a major IT project I've been managing the past several months. Timing is everything.)

Still, seeing where we are — I'm actually feeling pretty good.

Also, we've wrapped up close to the last of the non-contracting purchases: we've bought our faucets, we've bought the beverage fridge, and we know what we're buying for flooring (we just need to decide on the installer). So that's now largely over with, aside from paying it all off.

       

In Album Hill-Kleerup Kitchen – 2015-03-18

View on Google+

66 view(s)  

5 thoughts on “KItchen Project – Day 133: We Have a Room”

Leave a Reply

Your email address will not be published. Required fields are marked *