https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 190: Sink! (the Sequel)

Countertop guys returned and got the sink on the island installed. That provided an opportunity to do some cabinet work to accommodate the popup outlet that sits near it.

Based on this, we can now get finish plumbing installed in the kitchen, which should happen early next week: getting faucets and disposals and water/drain piping all installed and working, as well as hooking up the dishwasher. In another week we'll have functionality starting to return to the kitchen, huzzah!

I had a series of chats with the GC and we're working toward solutions with the range hood. We also need to adjust some of the wiring in the oven cabinet to accommodate the ovens. That's all probably going to kick off on Monday, along with some other finish electrical.

Making progress!

 

In Album 2015-05-15

View on Google+

54 view(s)  

Leave a Reply

Your email address will not be published. Required fields are marked *