The Mechanical/HVAC sub was in on Friday. Part of what got done were the toe-kick vent grills (which openings Jim and I made a bit too wide, but we'll survive).
More important was that the range hood got (mostly) mounted. Which is to say that the hood itself got mounted, and powered up, and the ductwork rejiggered and connected. The connection to the make-up air system is not yet decided on, though; they're still looking at the best way to do it between the two methods available.
The flooring, we are assured (by the Carpet Exchange guy who was assured by the manufacturer) is on a transport of some sort or another between Georgia and Here, to arrive next Wednesday. Floor install to follow.
The sprinkler guy was supposed to come out yesterday afternoon, but the side yard was something of a mud pit after the rain and we had to halloo off to a show, so we didn't see him.
Inch by inch …