https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project – Day 269: Ranged In

The last major gap, so to speak, in the kitchen has been fixed. The range could not be pushed all the way back to the wall because of a problem with the plywood on the floor and the position of the electrical outlet. The contracting crew was out on Friday, pulled the range out, fixed the problems, slid it back in, and it fits like a dream. Huzzah!

That largely wraps up the interior — the hinges on the doors to the dining room need to be replaced, and we need final inspection, but overall we're very good. Outside is a different matter, but that's a photo shoot for another day.

    

In Album Hill-Kleerup Kitchen – 2015-08-01

View on Google+

34 view(s)  

Leave a Reply

Your email address will not be published. Required fields are marked *