So two not-insignificant occurrences the past few days.
1. Jim and I carpeted the new basement room, using carpet squares from Home Depot (Soft Collection – Tranquility – Mountain Mist, for the record). Went fast and easy, and we've bought enough additional to (over time) recarpet the basement.
Now that's done, the contractor can install the baseboards, etc.
2. The drink fridge arrived today, huzzah, and, mirabile dictu, it was the correct model this time! Inconceivable!
This will let us serve guests without sending them out to the garage for sodas and beer. It will also give us a place to stash chilled wines and champagne that doesn't take up normal fridge space.
It's a Perlick C-Series, HC24BB (for those who keep track of such things (like myself at some future time.)
Coming up this week:
– Electrical finishing!
– Range hood!
– Beginning work on the side yard and sprinklers!
– Flooring arrives Friday!
And, given that we've festooned the room with Post-Its as to what should be going where, maybe we'll even start moving stuff into the kitchen …
In Album Hill-Kleerup Kitchen – 2015-06-08


… I do not think it means what you think it means