We had a hell of a downpour today — 1.5" in about 20 minutes — which helped test the grading and excavation on the side yard. Besides demonstrating that we really need some grass or other groundcover, as well as extensions of the downspouts, things actually worked out well — water flowed mostly where we expected, and none of it flowed into the basement. Huzzah!
We expect to have the final inspections this week. There's a possibility that something may need to be done with the main retaining wall. We'll see.
In Album Hill-Kleerup Kitchen – 2015-08-10


Y'all had rain cool