https://buy-zithromax.online buy kamagra usa https://antibiotics.top buy stromectol online https://deutschland-doxycycline.com https://ivermectin-apotheke.com kaufen cialis https://2-pharmaceuticals.com buy antibiotics online Online Pharmacy vermectin apotheke buy stromectol europe buy zithromax online https://kaufen-cialis.com levitra usa https://stromectol-apotheke.com buy doxycycline online https://buy-ivermectin.online https://stromectol-europe.com stromectol apotheke https://buyamoxil24x7.online deutschland doxycycline https://buy-stromectol.online https://doxycycline365.online https://levitra-usa.com buy ivermectin online buy amoxil online https://buykamagrausa.net

Kitchen Project: Day 24

Not a lot of visible progress outside, as, around the Thanksgiving holiday, the crew has been working on putting in rebar around the forms in the excavation for the foundation of the extension.

Meanwhile, Margie sealed a deal for the fridge we had planned on buying (a floor model with a very minor blemish, ad a substnatial discount). And we moved pictures and breakfronts from the dining room in anticipation of vibrations from the framing coming up once the foundation is poured.

Progress!

   

In Album Hill-Kleerup Kitchen – 2014-11-30

View on Google+

59 view(s)  

3 thoughts on “Kitchen Project: Day 24”

Leave a Reply

Your email address will not be published. Required fields are marked *